Projects

F.H. Paschen Projects

Project Description:
The installation of a wildlife deterrent fencing system known as “dig defence.” This system is placed along the airport’s perimeter fence below subgrade to prevent wildlife from interfering with runaway activities. The total amount of fencing being placed is about 40,000 linear feet.

Alternative Delivery Method: Job Order Contracting

Value: $

Atlanta, GA

Wildlife Perimeter Dig Defence

Client: City of Atlanta

Project Description:
The renovation of an existing learning resource center into a brand-new state of the art Innovation Center. The project also consisted of MEP and roofing upgrades to the entire building as well as locker room renovations at two separate middle schools.

Alternative Delivery Method: None

Value: $

Carol Stream, IL

Western Trails Elementary Renovations

Client: Community Consolidated School District 93

Project Description:
The design-build extension of the South Shore Line to reach high-growth areas in Lake County, IN. Proposed service would involve the operation of commuter rail electric trains to Dyer, Munster, and Hammond that would serve Metra’s Millennium Station in Downtown Chicago. This project is being completed through a joint venture between F.H. Paschen and Ragnar Benson with Jacobs as the designer.

Alternative Delivery Method: Design-Build

Value: $$$

Hammond to Munster, IN

West Lake Corridor

Client: Northern Indiana Commuter Transportation District

Project Description:
The multi-phased construction of a new 12,000 SF two-story lobby and renovations to 8,000 SF of adjacent spaces at the University of Illinois at Chicago Hospital. The lobby will include a custom designed reception desk, elevators to the 2nd Floor, seating areas and planters. The second floor will include a contemplation space, a Pastoral Care Suite, and modifications to existing spaces to allow for future bridge connection to a future building to be constructed directly across from the hospital.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Welcome Atrium

Client: University of Illinois Health Systems

Project Description:
The construction of a three-story, 49,000 SF addition to Walter Payton College Prep. Work also included site development and interior renovations of the existing facility. The school features general and specialty classrooms, lounge/cafe, multi-purpose Blackbox theater, admin offices, weight and fitness room, full-size gymnasium with gym lockers & offices.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Walter Payton College Prep Annex & Renovation

Client: Public Building Commission

Project Description:
The construction of a 47,875 SF new transit center next to Union Station. Work included a new tunnel connecting to the existing Amtrak pedway, an entrance with a staircase leading from street level to the tunnel, a freestanding building for bathroom facilities, CTA bus islands with canopies, fare collection machines, station support rooms, communications and security systems, lighting, signage, & architectural finishes.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Union Station Transit Center

Client: Chicago Department of Transportation

Project Description:
The construction of a new 36,000 SF four-story addition to the Skinner West Elementary School which included 19 classrooms, a science lab, art room, computer lab, and multipurpose rooms.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Skinner West Elementary School Annex

Client: Public Building Commission

Project Description:
The construction of a 207,000 SF institution designed to prepare students for technology jobs of the future. The new design includes a natatorium with an Olympic-sized swimming pool, a gymnasium, an auditorium, a full kitchen, administrative offices, a library, science labs, classrooms, and computer labs. Technological innovations, which helped establish the building’s LEED platinum status, include a geo-exchange heat pump system, a solar thermal hot water heating system, low-flow fixtures, and recycled and locally sourced materials. Outdoor features include walking paths, a community garden, a learning garden, and two rain gardens for storm-water control. There is also a new football field with a track, baseball field, softball field, and tennis courts constructed on the school’s campus to the north of the building.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Sarah E. Goode STEM Academy

Client: Public Building Commission

Project Description:
The structural renovations to the Harrison-Dever Intake Crib, the largest intake crib in the Department of Water Management's water treatment system.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Harrison-Dever Crib Complex Structural Renovations

Client: Chicago Department of Water

Project Description:
The construction of the new Cermak Road elevated station on the CTA’s Green Line. Work included the building of a new station with three entrances, one center platform, two elevators, stairs, station support rooms, communications and security systems, platform canopies and enclosures for weather protection, bike racks, signage, a fare collection machine, customer assistant booths, and several architectural finishes.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Green Line Cermak Road – Elevated Station

Client: Chicago Department of Transportation

Project Description:
The design-build of a 56,000 SF three-story steel and precast structure building which houses classrooms and offices. The project was designed, bid, and built by F.H. Paschen and design partner, UrbanWorks. This project achieved LEED Silver.

Alternative Delivery Method: Design-Build

Value: $$

Chicago, IL

Galewood Charter School

Client: United Neighborhood Organization (UNO)

Project Description:
The finishes for five metro stations on the new Silver Line that connects Washington D.C. to Loudon County in Virginia via Washington Dulles International Airport.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Tysons Corner, VA

Dulles Corridor Metrorail Project Phase 1: Station Finishes and Specialties

Client: Metropolitan Washington Airports Authority

Project Description:
The construction of a 65,000 SF annex added to the existing one-story elementary school. The annex included 30 classrooms, 2 administrative offices, a library/media center, multi-purpose dining room, hybrid kitchen & kitchen server, kitchen office, building storage, utility rooms, and elevator. This project was delivered using the Construction Manager at Risk delivery method by F.H. Paschen and joint venture partner Bowa Construction.

Alternative Delivery Method: CM@Risk

Value: $$$

Chicago, IL

Dirksen Elementary School Annex & Renovations

Client: Public Building Commission

Project Description:
The renovation of the existing CTA Blue Line subway stations at Grand, Chicago, and Division. Work consisted of new station entrance canopies, new structural glazed tile, electrical service upgrades, new LED lighting and communications, new roto-gates, and refurbishing of all existing finishes.

Alternative Delivery Method: Design-Build

Value: $$$

Chicago, IL

Dearborn Subway – Grand, Chicago, and Divison Station Improvements

Client: Chicago Department of Transportation

Project Description:
The improvements to the 40-year-old CTA Red Line South Branch between Cermak and 95th street. F.H. Paschen undertook improvements at eight stations; improvements included new paint, lighting, benches and bike racks, and the installation of three new elevators at Garfield, 63rd, and 87th, making these stations ADA accessible.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Dan Ryan Red Line Station Improvements

Client: Chicago Transit Authority

Project Description:
The renovation of the school’s Learning Center into a new Innovation Center. This project also consisted of a front entry vestibule and main office renovations.

Alternative Delivery Method: CM@Risk

Value: $

Carol Stream, IL

Cloverdale Elementary School Renovations

Client: Community Consolidated School District 93

Project Description:
The demolition and reconstruction of the existing B/C Tunnel pavement expansion joints and drip tray systems at the interfaces with Concourses B & C at O’Hare International Airport (ORD). This project took place on an active airfield and required coordinated gate closures with United Airlines and the Chicago Department of Aviation.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Checked Baggage Inspection System (CBIS)

Client: American Airlines

Project Description:
The build-out of tenant improvements at the Bridgeview Courthouse. The project includes 15,146 SF of interior demolition and buildout. Two enabling spaces are included with the above square footage and pertain to the relocation and remodeling of spaces for the Assessor's Office and Sheriff's Offices located in adjacent areas to CCDPH.

Alternative Delivery Method: None

Value: $

Bridgeview, IL

Bridgeview Courthouse Renovations

Client: Cook County Hospital & Health System

Project Description:
The interior renovation of a 2,000 SF of a laboratory classroom for Rush University. Renovations included the replacement of bio-safety hoods, replacement of classroom work surfaces, flooring and ceiling replacements, new openings, and MEP upgrades.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Armour Wetlab Renovation

Client: Rush University Medical Center

Project Description:
The addition of a 3,100 SF addition to the Administration Center. The project included a new Board Room, Conference Room, and Storage Room. The following trade packages were included: site demolition, earthwork, site utilities, asphalt, landscaping, structural steel, carpentry, fireproofing, roofing, glazing, flooring, painting, signage, casework, window shades, specialties, mechanical, electrical, plumbing, and fire suppression.

Alternative Delivery Method: None

Value: $

Carol Stream, IL

Administration Building Renovations

Client: Community Consolidated School District 93

Project Description:
The reconstruction of the railroad bridge, which had fallen into disrepair located near 71st street west of Cottage Grove Ave. A temporary shoring system was installed to support the main bridge members allowing work to safely proceed on the bridge.

Alternative Delivery Method: Unit Price

Value: $

Chicago, IL

71st Street Underpass Rehab

Client: Norfolk Southern Corporation

Placeholder Image

Project Description:

Alternative Delivery Method:

Value:

Auto Draft

Client:

41st street and Lake Shore Drive Pedestrian Bridge

Project Description:
The construction of a 1,350-foot-long bike and pedestrian bridge. This bridge provides Chicago’s Bronzeville neighborhood direct access to the lakefront and specifically the Oakwood/41st Street beach.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

41st Street Pedestrian Bridge Over South Lake Shore Drive

Client: Chicago Department of Transportation

Project Description:
The renovation of the first and second floor of Stroger Hospital. This project involved renovating 30,000 SF of the existing area to provide programmatic space for pharmacy, public safety, and outpatient clinic functions.

Alternative Delivery Method: Design-Build

Value: $

Chicago, IL

1st and 2nd Floor Hospital Renovations

Client: Cook County Hospital & Health System

Project Description:
The renovation of over 25,000 SF of the Norwegian American Hospital. This project was completed in 22 individual phases and seeks to create a warm and welcoming environment reflecting the quality of the care provided within, as well as cohesive defining a cohesive way finding strategy throughout the first floor.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

1st Floor Hospital Renovations

Client: Humboldt Park Health

Project Description:
The rehabilitation of the 47-year-old movable bascule bridge. Work included new roadway, sidewalk decks, repaired truss, floor beams, lateral bracing, and upgraded electrical and navigational lighting.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

18th Street Bascule Bridge Rehab

Client: Illinois Department of Transportation

Project Description:
The renovations of Greenbrook Elementary, Waterbury Elementary and Spring Wood Middle Schools over two summers. The existing libraries were transformed into more open and collaborative innovation centers, including break out rooms, meeting spaces, and STEM classrooms.

Alternative Delivery Method: CM@Risk

Value: $

Roselle & Hanover Park, IL

2020 Summer Renovations

Client: Keeneyvillle School District 20

Project Description:
The multi-phased office renovation that included electrical, HVAC, low voltage, and security upgrades as well as new sound masking systems.

Alternative Delivery Method: CM@Risk

Value: $

Leesburg, VA

3rd Floor Government Center Renovation

Client: Loudoun County

Project Description:
The multi-phased renovation of the 17,000 SF third floor of Stroger hospital. Phase one consisted of renovating an existing on-call and breakroom area into a fully serviceable pre-op center for patients. Phase two consisted of building-out new offices and conference room space and a new innovative area. Phase three involved converting existing office space into a multi-patent testing and exam area.

Alternative Delivery Method: Job Order Contracting

Value: $

Chicago, IL

3rd Floor Hospital Renovations

Client: Cook County Hospital & Health System

43rd-Street-Pedestrian-Bridge-S-LSD

Project Description:
The construction of a bike and pedestrian bridge. The new overpass, with a curvy design similar to the one completed at 41st Street, will allow wheelchair users, bicyclists and emergency vehicles to cross Lake Shore Drive.

Alternative Delivery Method: None

Value: $

Chicago, IL

43rd Street Pedestrian Bridge Over South Lake Shore Drive

Client: Chicago Department of Transportation

5-Atrium-OR-Renovations

Project Description:
The renovation and installation of new equipment to three operating rooms at the Rush University Medical Center Atrium building. The construction work was completed in multiple shifts while neighboring operating rooms remained in operation.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

5 Atrium OR Renovations

Client: Rush University Medical Center

95th Street Terminal Improvement Project

Project Description:
The design-build of a new passenger terminal on the south side of 95th Street Station and renovated and built an addition for the existing passenger terminal on the north side of 95th Street. A new pedestrian bridge over 95th Street was constructed, joining the north and south passenger terminals. 95th Street was also widened in both directions to accommodate new dedicated bus lanes, and a new bus bridge over the Dan Ryan/CTA Red Line was constructed.

Alternative Delivery Method: Design-Build

Value: $$$

Chicago, IL

95th Street Terminal Improvement Project

Client: Chicago Transit Authority

College of DuPage Administrative Building

Project Description:
The renovation of the Early Childhood Learning Center into the College of DuPage’s Administrative Office Building. In addition to the new office spaces and conference rooms, a complete replacement of the building’s mechanical system was completed.

Alternative Delivery Method: Design-Bid-Build

Value: $

Glen Ellyn, IL

Administrative Building Remodel

Client: College of DuPage

American Airlines Admirals Club

Project Description:
The redesign and renovation of levels one, two, and three of the American Airlines Admirals Club in Terminal 3 at O’Hare International Airport (ORD). The space was renovated with high-end furnishings and finishes, two full kitchens, increased bar capacity, and lighting and thermal comfort improvements to provide an improved overall member experience.

Alternative Delivery Method: Integrated Project Delivery

Value: $$

Chicago, IL

Admiral’s Club and Flagship Lounge

Client: American Airlines

Air Rescue Fire Fighting Facility (ARFF)

Project Description:
The construction of a new 25,000 SF firehouse for the Chicago Fire Department O’Hare Airport Operations Division. The building consists of 15,000 SF of living, dining, training, recreation, dormitory, locker, and office space, and four drive-through vehicle apparatus bays capable of accommodating eight vehicles and equipment staging and maintenance.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Air Rescue Fire Fighting Facility (ARFF)

Client: Chicago Department of Aviation

Project Description:
The multi-phased construction of an outdoor canopy expanding from Terminal 1 all the way through Terminal 3. This project was completed overnight to minimize disruption to daily airport operations.

Alternative Delivery Method: None

Value: $$$

Chicago, IL

Airport Canopies

Client: Chicago Department of Aviation

Airport Maintenance Complex

Project Description:
The construction of an 88,000 SF vehicle Maintenance facility at O’Hare International Airport (ORD) for the Chicago Department of Aviation. The building contains several service bays, offices, restrooms, as well as a mezzanine storage area with roof access.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Airport Maintenance Complex

Client: Chicago Department of Aviation

Project Description:
The construction of a new USPS Facility in Allen, Texas. The structural steel building houses a post office that serves the public, a postal processing center, a Postmaster office, and conference rooms. The project also included a new lobby area that has a storefront entrance with automatic door openers.

Alternative Delivery Method: None

Value: $$

Allen, TX

Alternate Headquarters

Client: United States Post Office Southern Facilities

Arthington Mall Renovations

Project Description:
The renovation of UIC’s Arthington Mall. This project included extensive site work and landscaping. Sustainable features include stormwater bioinfiltration, permeable surfaces, and 11,000 SF rain gardens. Arthington Mall is the first SITES-Certified university space in Illinois.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Arthington Mall Renovations

Client: University of Illinois - Chicago

Algonquin Bypass

Project Description:
The construction of 2.11 miles of a four-lane divided highway, a diamond interchange, four new bridges, 11 retaining walls, and one noise abatement wall. Most of the project involved construction of a new highway around the downtown area of Algonquin, IL as well as the reconstruction of the existing Route 31 Main Street.

Alternative Delivery Method: None

Value: $$$

Algoquin, IL

Algoquin Bypass

Client: Illinois State Toll Highway Authority

Project Description:
The construction of a new 80,000 SF four-story school. Exterior features include a variety of architectural facades including Fiber-C rain screen panels and a curtainwall glazing. Interior amenities include wireless access throughout and automated lighting control. The school contains 31 classrooms including two science labs and six computer labs, a full cooking kitchen and cafeteria, and media room.

Alternative Delivery Method: CM@Risk

Value: $$

Chicago, IL

Aspira Business and Finance High School

Client: Aspira of Chicago

Project Description:
The renovation of the existing site of one portable dry mix plant and one portable central mix plant to a state-of-the-art new facility consisting of three main structures: the plant building, primary aggregate building, and the secondary aggregate building.

Alternative Delivery Method: None

Value: $$

Des Plaines, IL

Batch Plant Facility

Client: Ozinga Ready Mix Concrete Inc.

Project Description:
The construction of an ATS bridge on the landside at O’Hare International Airport (ORD). This bridge extends the ATS from its current end point at Lot E to its new end point at the new joint use consolidated parking facility in what was Lot F.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Automated Transportation System (ATS) Extension

Client: Chicago Department of Aviation

Project Description:
The replacement of six truck lifts which service MARTA’s train fleet. Work included the removal of the existing lift equipment, removal and disposal of all hydraulic fluids and contaminated soils, creating 9 ft deep, 4 x 6 pit configuration by hand excavation and engineered shoring, installation of fiber glass caissons, providing flowable fill backfill material and concrete placement followed by the installation of the new Lift equipment.

Alternative Delivery Method: Job Order Contracting

Value: $

Atlanta, GA

Avondale Yard

Client: Metropolitan Atlanta Rapid Transit Authority

Project Description:
The construction of a brand new two-story, 25,000 SF clinic in the Belmont-Cragin Neighborhood.  This facility has 30 exam rooms and provides dental, social, and medical services.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Belmont-Cragin Clinic

Client: Cook County Hospital & Health System

Project Description:
The rehabilitation of the bridge on East 209th Street over Morse Reservoir, found west of Hague Road in Noblesville Township, Hamilton County, Indiana. Due to the age, condition, and importance of this bridge the rehabilitation was completed quickly.

Alternative Delivery Method: None

Value: $

Noblesville, IN

Bridge No. 98 Rehabilitation

Client: Bridge No. 98 Rehabilitation

Project Description:
The construction of the Pace Pedestrian Bridge over the Jane Addams Memorial Tollway (I-90) and the construction of the north and south bridge access buildings. This bridge provides access to and from the east and provides access to a Park-n-Ride station by Pace Bus.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Hoffman Estates, IL

Barrington Road Pedestrian Bridge and Access Building

Client: Illinois State Toll Highway Authority

Project Description:
The design-build for renovations and repairs to five Blue Line stations: Addison, Irving Park, Montrose, Harlem, and Cumberland. The project also added accessibility for customers with disabilities at the Addison station with the installation of a new elevator.

Alternative Delivery Method: Design-Build

Value: $$$

Chicago, IL

Blue Line Five Station Renovations

Client: Chicago Transit Authority

Project Description:
The reconstruction of the 47C bridge, Indiana Harbor Belt Railroad needed to upgrade and replace the three independent, wooden railroad bridges over Thornton Road in Dixmoor. Construction was performed in phases to keep train traffic open at all times. The new structure kept the existing elevation to match the track on both sides.

Alternative Delivery Method: Unit Price

Value: $$

Dixmoor, IL

Bridge 47C Reconstruction

Client: Indiana Harbor Belt Railroad

Project Description:
The interior renovation of an existing one-story, 50,000 SF warehouse and built out spaces such as a gym, apartment lab, café lab, offices, and more. The Bridges Program in Niles Township High School District 219 provides post-high school training to adult graduates with special needs.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Lincolnwood, IL

Bridges Program Renovations

Client: Niles Township High School District 219

Project Description:
The roadway improvements of Burley Avenue and 122nd Street. The project consisted of site work that included installing storm sewers, excavation, installing asphalt paving, and landscaping.

Alternative Delivery Method: None

Value: $

Chicago, IL

Burley Avenue & 122nd Street Roadway Improvements

Client: NorthPoint Development

Project Description:
The construction of a 35,000 SF two-story addition to the existing elementary school. Additions included classrooms, a new library, and a warming kitchen. F.H. Paschen also renovated existing classrooms in the original building, renovated the existing parking lot, and built a new turf field.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Byrne Elementary School Annex

Client: Public Building Commission

Project Description:
The major facility upgrades at the Calumet Water Reclamation Plant. Phase one included preliminary sewage screening and pumping facilities. Phase two involved construction of a new grit building. The project also included 12, 155-feet diameter primary settling tanks, along with several interconnecting service tunnels, four new tunnel access pump stations, and two 96-inch force mains extending to the grit building.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Calument Primary Settling Tanks

Client: Metropolitan Water Reclamation District of Chicago

Project Description:
The construction of a new 8,900 SF headquarters for the New Indiana National Guard ORTC. The project consisted of a masonry block with brick veneer, shingled roof, to house new offices, storage, and restroom facilities.

Alternative Delivery Method: None

Value: $

Edinburgh, IN

Camp Atterbury ORTC Company Headquarters

Client: State of Indiana

Project Description:
The three-phased renovation of an occupied Interventional Radiology Suite and Cardiac Cath Lab at the University of Illinois Chicago, which included complete demolition of existing room finishes, and infrastructure upgrades to mechanical and electrical services servicing equipment to each room.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

CATH I.R Labs Remodel

Client: University of Illinois - Chicago

Project Description:
The activation of another operating room for the University of Chicago Medicine. Work included activating and installing the infrastructure for the room, including surgical boom support, a surgical sink, and light retrofit.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

CCD Operating Room Activation

Client: University of Chicago Medical Center

Project Description:
The design-build of a 17,888 sf facility that serves as a fleet repair garage, wash bay, and warehouse. The facility also includes administrative offices, open office areas, café & kitchen areas, locker rooms, and a fitness room.

Alternative Delivery Method: Design-Build

Value: $$

Chicago, IL

Central Business District

Client: Private Client

Project Description:
This award-winning project included the construction of a four-story, 7,500 SF deicing facility that houses communication equipment and personnel at O’Hare International Airport. The facility is a steel structure with composite panels, extensive communication systems, UPS, and grounding.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Central Deicing Facility Ramp Tower

Client: Chicago Department of Aviation

Project Description:
The construction of a Central Maintenance Facility (CMF) Salt Storage. The project consisted of a 90’ diameter dome, 10,000 gallons underground storage tank, stationary conveyor, rain garden and storm system, and associated plumbing and electrical components.

Alternative Delivery Method: None

Value: $

Fairfax, VA

Central Maintenance Facility Salt Storage Dome

Client: Fairfax County Department of Public Works & Environmental Services

Project Description:
The design-build of a 75,560 SF building. The building houses fleet repair bays, training rooms, offices, fitness room, locker rooms, and a material storage warehouse. The service center is home to approximately 400 full-time employees and will operate nonstop.

Alternative Delivery Method: Design-Build

Value: $$$

Chicago, IL

Central Shop Field Service Center

Client: Private Client

Project Description:
The exterior and interior renovations to the Chicago Bee Branch Library, which is a Landmark building in the city of Chicago. Exterior renovations included terra cotta, refurbishment of historical windows, fencing installation, and parking lot asphalt repairs. Interior renovations included full power and data upgrades, new carpet and tile, new building automation system, new fire alarm system, new access control system, and bathroom renovations.

Alternative Delivery Method: Job Order Contracting

Value: $

Chicago, IL

Chicago Bee Library

Client: Chicago Department of Assest, Information and Services (AIS)

Project Description:
The improvements of the Chicago River Riverwalk. Work included replacing and widening the Riverwalk path, adding new vendor spaces for Minority and Women Owned Businesses, and placing an additional 75,000 SF of new landscape.

Alternative Delivery Method: Job Order Contracting

Value: $

Chicago, IL

Chicago Riverwalk Esplanade Improvements & Marketplace

Client: Chicago Department of General Services

Project Description:
The fast-track, ten-week renovation of an existing and vacant school building for the Chicago Waldorf School. Renovations consisted of interior upgrades and renovations, including new ADA bathrooms, new water fountains, flooring and painting in the classrooms and administrative offices, new classroom layouts, and a new gymnasium floor.

Alternative Delivery Method: CM@Risk

Value: $

Chicago, IL

Chicago Waldorf School Building Renovation

Client: The Chicago Waldorf School

Project Description:

Alternative Delivery Method: None

Value: $

Chicago, IL

Cinespace Streetscape Project

Client: Cinespace Chicago Film Studios

Project Description:
The partial build-out of the fourth floor and a full build-out of the fifth floor of the Mile Square Health Center building to provide a clinical instructional simulation center. The project includes lobbies and reception, 22 standardized patient clinical exam rooms, an emergency room, inpatient, outpatient, and operating room simulation suites, control rooms, a procedural skills lab; conference/debriefing rooms, and computer/learning lab classrooms.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Clinical Performance Center

Client: University of Illinois - Chicago

Project Description:
The interior renovation of the Grove Community Arts Center. Work included renovation of the lobby, vestibule, multipurpose room, and 360-seat theatre. The expanded space meets the community’s increasing demand for more performing arts classes and opportunities, event and training space, and Park District programs.

Alternative Delivery Method: Design-Bid-Build

Value: $

Buffalo Grove, IL

Community Arts Center Interior Renovation

Client: Buffalo Grove Park District

Project Description:
The renovation to Schaumburg’s Community Recreation Center included all new finishes in the bathrooms, recreation rooms, and office spaces, as well as new structural staircases and glazed decorative metal handrails, and new automatic sliding doors at the entry and interior storefront.

Alternative Delivery Method: Design-Bid-Build

Value: $

Schaumburg, IL

Community Recreation Center Renovation

Client: Schaumburg Park District

Project Description:
The construction of a new 49,540 SF concourse at O’Hare International Airport (ORD). The concourse is capable of handling five regional aircraft, with a pedestrian bridge which connects to Terminal 3.

Alternative Delivery Method: CM@Risk

Value: $$$

Chicago, IL

Concourse L “Stinger”

Client: American Airlines

Project Description:
The construction of a new 19,725 SF firehouse, constructed to Public Building Commission prototype ‘B’ design, includes an apparatus bay, emergency vehicle and HazMat equipment storage, kitchen and dining area, locker rooms, sleeping quarters, officer’s quarters, a training room, a meeting room, a radio room, and EMS Field Division offices.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Engine Co. 16

Client: Public Building Commission

Project Description:
The construction of 10 canopies at Metro Station entrances in different parts of D.C., Virginia, and Maryland.

Alternative Delivery Method: Design-Build

Value: $$$

Washington, DC

Escalator Canopies

Client: Washington Metropolitan Area Transit Authority

Project Description:
The construction of a new Ground Equipment Maintenance (GEM) building for American Airlines at O’Hare International Airport (ORD). The new facility features storage of ground equipment, 30 maintenance work bays, vehicle fluids distribution system, a vehicle wash facility, and 20,000 SF of employee workspace.

Alternative Delivery Method: CM@Risk

Value: $$$

Chicago, IL

Ground Equipment Maintenance Facility

Client: American Airlines

Halsted Street Bridge Railway Construction

Project Description:
The removal and replacement of three railroad bridges over Halsted St. Columns underneath the bridges were replaced first, followed by the removal and replacement of the bridge structures.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Halsted Street Bridge – W3.34 Replacement

Client: CN Railroad

Project Description:
The renovation and reconfiguration of four gates and 11 podiums for United Airlines in Ronald Reagan Washington National Airport (DCA). Work was completed one gate at a time and typically during off-hours to minimize disruptions to travelers and United Airlines.

Alternative Delivery Method: Design-Bid-Build

Value: $

Arlington, VA

Hold Room Configuration

Client: United Airlines

Project Description:
The construction of a park pavilion structure to serve as the stage area for summer concerts and to house public restrooms for the new park. Work included the demolition of an existing structure, and construction of the new one-story pavilion.

Alternative Delivery Method: Design-Bid-Build

Value: $

Winnetka, IL

Hubbard Woods Pavilion

Client: Winnetka Park District

Project Description:
The construction of the 2,100 FT long bridge that was built over the existing I-290. The flyover ramp bridge was built in three segments and included eight concrete piers with 6 to 8-ft. diameter columns and 54 steel girders to support the new ramps. The bridge’s deck is 49-ft wide (two lanes and wide shoulders on each side) and is 34-ft. above grade at its highest point.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Itasca, IL

I-290 / Elgin O’Hare Flyover Bridge

Client: Illinois State Toll Highway Authority

Project Description:
The reconstruction of multiple bridges and large cut and cover tunnel drainage structures as well as high-performance concrete pavements designed to be in service for as much as 35 years.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

I-90 Widening & Reconstruction

Client: Illinois State Toll Highway Authority

Project Description:
The construction of part of the Lakefront Trail, an elevated walkway that spans over Illinois Street and Grand Avenue at the intersection of Lake Shore Drive. 0.31 miles were constructed, and the work consisted of a new superstructure for pedestrian and bicycle traffic use.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Lakefront Trail & Navy Pier Flyover Improvement

Client: Chicago Department of Transportation

Project Description:
The construction services for playground areas at Long Bridge Park in Arlington, Virginia. Work included the provision and installation of site storm utilities, concrete sidewalks, playground equipment, high pressure fog system, playground surfacing, and custom site furnishings.

Alternative Delivery Method: Design-Bid-Build

Value: $

Arlington, VA

Long Bridge Park Playground Areas

Client: Arlington County

Project Description:
The renovation for Indiana University involved renovating 61,000 SF which included 160 hotel rooms, corridors, and elevator lobbies on four floors.

Alternative Delivery Method: Job Order Contracting

Value: $$

Bloomington, IN

Memorial Union Biddle Hotel Guest Rooms Renovation

Client: Indiana University

Project Description:
The multi-phased construction of a park in Miami, Florida. F.H. Paschen took part in the second and third phase of the project which included site work, lighting, walkways and ramps, site furnishings landscaping, and promenade walkway irrigation.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Miami, FL

Museum Park Baywalk & Promenade Phase 2 & 3

Client: City of Miami

Project Description:
The construction of new 58,000 SF headquarters for the Chicago Park District. The new Park District campus will feature 14 acres of green space, a new 20,000 SF field house, playground, athletic fields, water features, among many other amenities. This project is a joint-venture with ALL Construction Group. Architect: John Ronan Architects (Renderings)

Alternative Delivery Method: None

Value: $$$

Chicago, IL

New Headquarters and Campus

Client: Chicago Park District

Project Description:
A historic plan made by the City of Chicago and its airline partners that will transform O’Hare International Airport (ORD) with the biggest terminal expansion ever is underway. The upgrades are set to grow ORD’s overall terminal square footage by more than 60% and increase gate frontage by 25%. More information can be found at www.tpapord.com.

Alternative Delivery Method: CM@Risk

Value: $$$

Chicago, IL

O’Hare 21 Program

Client: Chicago Department of Aviation

Project Description:
The 80,000 SF expansion of the pedestrian bridge at Midway International Airport (MDW). The construction was completed without disrupting airport operations or daily vehicular traffic over Cicero Avenue, which remained open through the duration of the project.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Passenger Checkpoint Expansion

Client: Chicago Department of Aviation

Project Description:
The construction of a one-story 2,458 SF kayak and canoe storage and vending facility. Part of the facility is an enclosed storage area with ornamental fencing for kayaks and canoes. The other section of the building houses restrooms, an office, and a janitor’s closet. The exterior plaza space consists of a metal canopy and a walk to a floating dock.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Ping Tom Park Boat House

Client: Chicago Park District

Project Description:
The design-build project included abatement in the ceiling and floor, gutting and renovating the women's locker room, police roll call area, break room, and report-writing areas inside the Park Ridge Police Department, which is in the basement of City Hall. Work was completed while the department remained fully operational.

Alternative Delivery Method: None

Value: $

Park Ridge, IL

Police Department Renovation

Client: Police Department Renovation

Project Description:
The renovation of an existing warehouse space into a new public works facility inclusive of new offices, washrooms, locker rooms, mechanics garage, and interior storage and workshop facilities, in addition to all associated mechanical, plumbing, and electrical upgrades.

Alternative Delivery Method: None

Value: $

River Grove, IL

Public Works Facility Renovations

Client: Village of River Grove

71st Street Underpass Rehab

Project Description:
The rehabilitation of a portion of the Norfolk Southern Railroad Bridge over South Cottage Grove Avenue just south of 71st Street in Chicago. Work was coordinated with other Chicago Department of Transportation projects being performed in the area so as not to conflict with traffic patterns.

Alternative Delivery Method: Unit Price

Value: $

Chicago, IL

Railroad Over Cottage Grove Ave.

Client: Norfolk Southern Corporation

Project Description:
The construction of the west and center segments of Runway 9C – 27C for the $6.6B O’Hare Modernization Program. This runway was constructed in several phases to maintain aircraft traffic movements and critical Aircraft Rescue and Recovery routes during this project.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Runway 9C-27, Bid Packages 1 & 2

Client: Chicago Department of Aviation

Project Description:
The construction of a recreation center in Washington, D.C. The center was built to accommodate the recreational interest of the community and Goding Elementary School. Work included a new playground and play spaces with educational features, landscaping and irrigation, and the refinishing of existing parking lots.

Alternative Delivery Method: Design-Build

Value: $

Washington, DC

Sherwood Recreation Center Play Area

Client: DC Department of General Services

Project Description:
The pre-construction and construction services to build a 14,000 SF simulation laboratory for the University of Illinois – Chicago School of Nursing. The new space provides nursing students with simulated clinical, hospital, and home care settings alongside three main instructional spaces.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Simulation Laboratory for College of Nursing

Client: University of Illinois - Chicago

Project Description:
The rehabilitation of the Wilmette and Evanston Pump Station. The first phase isolated the existing pump station, phase two included the installation of cofferdams around the Diversion Channel, dewatered the site, replaced old concrete, and removed the existing roller gate structure. Phase three of the project, F.H. Paschen installed a permanent steel sheet pile wall and removed and replaced an existing concrete retaining wall.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Willmette, IL

Stop Logs & Diversion Pumps at Wilmette Pump Station & Evanston Pump Station Rehab

Client: Metropolitan Water Reclametion District of Chicago

Project Description:
The 10-phase interior renovation across three floors at Sulzer Library. Work included new flooring and painting throughout the building, a new circulation desk around second floor atrium, new conference rooms, upgraded power and data, bathroom renovations, a new building automation system, a new AV system in the auditorium, and children’s area upgrades.

Alternative Delivery Method: None

Value: $

Chicago, IL

Sulzer Library

Client: Chicago Department of Assest, Information and Services (AIS)

Project Description:
The renovation of The Schaumburg Park District facilities, this 4,000 SF project included the renovation of the Tennis Plus Facility and the Bock Neighborhood Center.

Alternative Delivery Method: Design-Bid-Build

Value: $

Schaumburg, IL

Tennis Plus & Bock Center Renovation

Client: Schaumburg Park District

Project Description:
The construction of a 208’ wide by 116’ tall roller compacted concrete gap dam, designed to prevent flooding at Thornton Quarry. Construction included reinforced concrete quarry plugs within the level two and level three haul tunnels that extend through the rock dam at elevation.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Thornton Quarry

Client: Metropolitan Water Reclamation District of Chicago

Project Description:
The construction of a new railroad over a roadway grade separation structure for the re-aligned Union Pacific Railroad over Irving Park Road. Work included demolition, earth excavation and site work.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Union Pacific Railroad – Irving Park Road

Client: Union Pacific Railroad - Irving Park Road

Project Description:
The restoration of UIC’s University Hall building façade. This project included the pouring of over 200 cubic yards of concrete to repair its columns and spandrels. The 28-story brutalist style building is the tallest building on Chicago's West Side.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

University Façade Repair

Client: University of Illinois - Chicago

Project Description:
The construction of a 1,500 SF addition to the Veterinary Medicine Teaching Hospital to house a linear accelerator vault. This project also consisted of additional remodeling of 1,200 SF of support space on the lower level of the existing building including the control room, mechanical equipment room, a treatment planning area, holding and prep/recovery space, and offices.

Alternative Delivery Method: Design-Bid-Build

Value: $

Urbana, IL

Vet Teaching Hospital LINAC Addition

Client: University of Illinois - Urbana

Project Description:
The construction of a new gateway entrance to the city from the west. Work began with the demolition of existing interchange roadways and Lower Wacker Drive tunnels. Rehabilitation involved extensive foundation work, deck and beam replacement along Congress Parkway. New tunnels from lower Wacker Drive to westbound Congress Parkway and from eastbound Congress Parkway to Wacker Drive/Franklin Street were also included. Wells Street was widened, and Van Buren Street was resurfaced between Wells Street and Wacker Drive.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Wacker Drive Reconstruction Congress Parkway Interchange Improvements

Client: Chicago Department of Transportation

Project Description:
The demolition of the Western Avenue viaduct over Belmont Avenue. F.H. Paschen also completed the reconstruction of Western Avenue between the Chicago River bridge and W. Roscoe Street, the resurfacing of a portion of Western Avenue and the reconstruction of the Western Avenue bridge over the Chicago River.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Western Avenue Viaduct Over Belmont Avenue

Client: Chicago Department of Transportation

Project Description:
The construction of a new station at Washington/Wabash servicing the Loop neighborhood along Wabash Avenue’s Jewelers Row district. The Washington/Wabash Station combined the historic, but dated, Madison/Wabash & Randolph/Wabash stations into a single station with 800’ of ADA accessible elevated platform and is next to five continually running CTA Routes.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Washington/Wabash Loop Elevated CTA Station

Client: Chicago Department of Transportation

Project Description:
The renovation of the West End Building at Oakton Community College. Renovations stretched across two floors of classrooms and were completed over four phases to allow the building to remain open to students and staff.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Des Plaines, IL

West End Building and “Student Street” Renovation

Client: Oakton Community College

Project Description:
The 17-acre design-build of three youth baseball fields with dugouts, two soccer fields, a picnic pavilion, two restroom buildings, concession area, a 10-bay batting cage, and a playground. All civil, drainage, irrigation, and building designs were developed jointly with Crisp County officials.

Alternative Delivery Method: Design-Build

Value: $

Cordele, GA

Youth Ball Complex

Client: Crisp County Parks & Recreation

Project Description:
The renovation of the Fairfax County Courthouse. Renovations included six courtrooms, jury deliberation rooms, attorney-client rooms, audio and visual rooms, bathrooms, and judge’s corridor. Work included the demolition and replacement of existing floor, wall, and ceiling finishes as well as demolition and/or modifications of existing sprinkler, plumbing, mechanical, electrical and security systems supporting the courtrooms.

Alternative Delivery Method: None

Value: $

Fairfax, VA

Courtroom Renovations

Client: Fairfax County

Project Description:

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

CT Sim DCAM

Client: University of Chicago Medical Center

Project Description:
The demolition and replacement of the east cooling tower which serves three chillers at the O’Hare International Airport (ORD) Heating & Refrigeration Plant. Additional work also included new condenser water pumps that serve the new east cooling tower, extensive electrical power work, and extensive controls systems to operate and monitor the system.

Alternative Delivery Method: Design-Build

Value: $$

Chicago, IL

East Cooling Tower Replacement

Client: Chicago Department of Aviation

Project Description:
The construction of a seven-story, 6,377-space parking garage at Midway International Airport (MDW). The parking garage includes a shuttle bus bridge, four stair towers, and two elevators.

Alternative Delivery Method: None

Value: $$$

Chicago, IL

Elevated Parking Garage

Client: Chicago Department of Aviation

Project Description:
The structural excavation, structural concrete, noise abatement wall removal and installation, and retaining wall installation. Work also included the widening of the bridge/roadway from Irving Park Rd. to Roselle Rd.

Alternative Delivery Method: Unit Price

Value: $$$

Itasca, IL

Elgin O’Hare Western Access Tollway

Client: Illinois State Toll Highway Authority

Project Description:
The remodel of the 7,500 SF front-half of the Emergency Department at the University of Illinois at Chicago Hospital to provide better patient flow. Work included a new waiting, reception, triage, nurse station, treatment areas, check-out and support spaces.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Emergency and Triage Remodel

Client: University of Illinois Health Systems

Project Description:
The construction of a new emergency operations center. This building is one of the first of its kind by hosting three separate agencies to better service the community. It houses the new headquarters for the Center Grove Police Department, a full-service fire station shared by White River Township and Bargersville, and a satellite office for the Johnson County Sheriff's Office.

Alternative Delivery Method: Design-Bid-Build

Value: $

Greenwood, IN

Emergency Operations Center

Client: Center Grove School Operation

Project Description:
The site remediation and construction of a 5,000 SF two-story annex to the existing Zapata Elementary Academy. Construction included new classrooms, a computer lab, student dining room and server, administrative offices, faculty workroom, restrooms, storage, mechanical, and electrical rooms.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Emiliano Zapata Annex

Client: Public Building Commission

Project Description:
The construction of a new, 20,000 SF two-story annex to the existing two-story school. The annex includes standard classrooms, a science lab, a computer lab, an art room with storage, administrative offices, a new dining room and kitchen, bathrooms, and storage areas.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Esmond Elementary School Annex & Renovations

Client: Public Building Commission

Project Description:

Alternative Delivery Method: None

Value: $

Chicago, IL

Fluoroscopy Lab Renovation

Client: University of Chicago Medical Center

Project Description:
The interior build-out of an outpatient medical clinic on the ground floor of an existing building that was previously a Sports Authority for the North Riverside Health Center. The new space provides outpatient, x-ray, and dental rooms, nurse stations, bathrooms, conference rooms, lobby/reception areas, and offices.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Health Center Renovation & Replacement

Client: Cook County Hospital & Health System

Project Description:
The construction of a new floodwater containment facility along with a park that includes four baseball fields, a concessions facility, a bandshell for concerts, a pavilion, and four soccer facilities. The flood facility was made up of five separate basins and two pump stations that can hold up to three million gallons of water to hold any overflow from the Des Plaines River.

Alternative Delivery Method: None

Value: $$

Wheeling, IL

Heritage Park Flood Control Facility

Client: Metropolitan Water Reclamation District of Chicago

Project Description:
The demolition of the O’Hare Oasis building and bridge structure over I-294 to allow for the addition of traffic lanes in the future expansion of the I-294 corridor.

Alternative Delivery Method: Unit Price

Value: $$

Schiller Park, IL

I-18-4390 I-294 O’Hare Oasis Bridge Demolition & Grading

Client: Illinois State Toll Highway Authority

Project Description:
The renovation of three schools for the Community Consolidated School District 93. Work included renovating the existing libraries into collaborative innovation centers, as well as constructing secure entry vestibules and new exterior canopies.

Alternative Delivery Method: CM@Risk

Value: $

Carol Stream, IL

Innovation Center & Entry Renovations

Client: Community Consolidated School District 93

Project Description:
The renovation of the Jardine Water Plan laboratory. Work included environmental demolition, new mechanical, electrical, and plumbing systems. The laboratory received all new laboratory equipment for water testing per EPA standards and office furniture.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Jardine Water Purification Plant Laboratory Improvements

Client: Chicago Department of Water Management

Project Description:
The construction of a new STEM wing at Jay Stream Middle School. As the construction manager, we phased the construction to take place during school holidays and breaks to minimize disruptions. The new wing is 5,400 SF and includes six science labs, a design and research room, a virtual reality room, and a single sloped skylight spanning the entire length of the corridor.

Alternative Delivery Method: CM@Risk

Value: $$

Carol Stream, IL

Jay Stream Middle School STEM Lab

Client: Community Consolidated School District 93

Project Description:
The construction of a new seawall and pedestrian bridge as part of Related Midwest’s Lathrop Homes redevelopment project. The updated river walk is one highlight of the 32-acre site that will feature residential units and new retail spaces.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Lanthrop Homes River Front Improvements

Client: Landlease

Project Description:
The renovation of the gymnasium at Larsen Middle School. Work included replacement of missing/damaged floorboards, removal of the existing bleachers, replacement of wall fixtures, tiling, and water fountains.

Alternative Delivery Method: None

Value: $

Elgin, IL

Larsen Middle School Gym Renovations

Client: ARCON Associates - Elgin SD U46

Project Description:
The demolition and reconstruction of the existing B/C Tunnel pavement expansion joints and drip tray systems at the interfaces with Concourses B & C at O’Hare International Airport (ORD). This project took place on an active airfield and required coordinated gate closures with United Airlines and the Chicago Department of Aviation.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Leak Repairs to Concourse B & C Pedestrian Tunnel

Client: Chicago Department of Aviation

Project Description:
The renovation of an existing 36,000 SF two-story library built in 1919. Renovations included the remodeling of the existing floor plan, mechanical upgrades, fire alarm and security systems LED lighting conversion, new interior finishes, and technology infrastructure. Additional work includes improving accessibility by adding a lift to access the mezzanine level and elevator modernization.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Legler Regional Library Renovation

Client: Public Building Commission

Project Description:
The renovation and infrastructure upgrade of the Linear Accelerator (LINAC) at the University of Illinois Health Systems Outpatient Care Center. The LINAC is used for external beam radiation treatments for patients with cancer. The LINAC was installed in a thickened concrete vault, with an entrance designed as a maze in order to mitigate radiation scatter.

Alternative Delivery Method: Job Order Contracting

Value: $

Chicago, IL

LINAC Replacement

Client: University of Illinois Health Systems

Project Description:
The design-build of a 100,000 SF facility that serves as a warehouse, pipe bay, tool shop, and meter repair shop. The facility also includes administrative offices, open office areas, café & kitchenette areas, storage facilities, and locker rooms.

Alternative Delivery Method: Design-Build

Value: $$$

Chicago, IL

Logistics Support Center

Client: Private Client

Project Description:
The renovation and expansion of an occupied and operational USPS main office in Mansfield, TX. This project was phased out and consisted of a 6,000 SF addition which contains a new work room, offices and electrical room. The renovation work included the service counter area, conference room, and storage room.

Alternative Delivery Method: Design-Bid-Build

Value: $

Mansfield, TX

Main Office Building Expansion

Client: United States Post Office Southern Facilities

Project Description:
The construction management services for the addition of a new, 9,600 SF gymnasium and multi-purpose room to the existing one-story McDade Classical Elementary School. The new annex includes a gymnasium, multipurpose room, office, storage, a science classroom, restrooms, and building support spaces/rooms. This project was completed as a joint venture with Bowa Construction.

Alternative Delivery Method: CM@Risk

Value: $$

Chicago, IL

McDade Classical Elementary School Annex & Renovations

Client: Public Building Commission

Project Description:
The demolition and construction of the existing stormwater release and bypass system, pump house, sediment pad, spillway, and access road.

Alternative Delivery Method: CM@Risk

Value: $$

Burbank, IL

Melvina Ditch Reservoir Improvements

Client: Metropolitan Water Reclamation District of Chicago

Project Description:
The improvements of the 150,000 SF Elgin High School Stadium. Improvements included the replacement of the existing running track, site lighting and controls, and a new drainage system.

Alternative Delivery Method: Design-Bid-Build

Value: $

Elgin, IL

Memorial Field Stadium Improvements

Client: Elgin High School

Project Description:
The construction of a park in remembrance of the 2009 Metrorail accident that resulted in nine individuals losing their lives. Work included the implementation of landscaping, hardscaping, site amenities, installation of lighting, and various site furnishings.

Alternative Delivery Method: Design-Build

Value: $

Washington, DC

Metro Memorial Park

Client: DC Department of General Services

Project Description:
The construction of a new northbound bridge structure, which has 27 spans supported by 26 piers, including multiple spans over waterways and active railroad tracks. The spans will support a total of nearly 427 beams of various lengths, including both steel and concrete. Reducing the number of piers minimizes the environmental impact on the project area as well as the operations of adjacent transportation systems that include the Des Plaines River, Chicago Sanitary and Ship Canal, the Illinois and Michigan Canal, two sets of major railroad tracks, local roads, and a pipeline that sends jet fuel to O’Hare Airport.

Alternative Delivery Method: None

Value: $$$

Willowsprings, IL

Mile Long Bridge

Client: Illinois State Toll Highway Authority

Project Description:
The renovation of the existing radiology reception and waiting room at the University of Chicago Medical Center. Renovations included staff and public restrooms, elevator lobby, and upgrades spaces, finishes and aesthetic upgrades.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Mitchell 1 Reception Remodel

Client: University of Chicago Medical Center

Project Description:
The conversion of an existing patient recovery room and storage room into two dialysis port procedure rooms and a prep room at the University of Chicago Medicine's Mitchell Hospital. Work also included ceiling replacement, wall protection, flooring, and painting.

Alternative Delivery Method: None

Value: $

Chicago, IL

Mitchell Dialysis Access Center

Client: University of Chicago Medical Center

Project Description:
The reconstruction of the Morgan Station in the West Loop neighborhood of Chicago. This updated station consists of a modern glass and metal station house on either side of the Lake Street house and ADA-accessible station houses with elevators to the Green and Pink CTA lines. A bridge above the tracks connects the buildings, and translucent canopies above each platform have information screens suspended from them.

Alternative Delivery Method: None

Value: $$$

Chicago, IL

Morgan Street Station

Client: Chicago Department of Transportation

Project Description:
The replacement of an MRI and CT machine at the SimonMed Streeterville location. Other improvements included HVAC, electrical, and structural upgrades to accommodate the new equipment.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

MRI Replacement

Client: SimonMed Imaging LLC

Project Description:
The build-out of an existing office space into a new Mutli-Specialty Clinic location for UIC’s College of Medicine. This clinic serves as an opportunity for UIC to offer specialty services in a new convenient location to many patients.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Multi-Specialty Ambulatory Clinic

Client: University of Illinois - Chicago

Project Description:
The design-build of an 83,000 SF two-story building that serves as a fleet hub, service center, office, warehouse, and field support shop.

Alternative Delivery Method: Design-Build

Value: $$$

Chicago, IL

North Shop Field Service Center

Client: Private Client

Project Description:
The complete renovation of the 4th floor NW wing into an Obstetrical Emergency Room unit at UI Hospital. This new unit includes a central nurse’s station, 6 Exam Rooms, an Ultrasound Room, Procedure Room, and supporting rooms which include HLD, Soiled Hold, and Clean Utilities.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

OB Emergency Renovation

Client: University of Illinois - Chicago

Project Description:
The renovation of the Berg Instructional Center (BIC) at the College of DuPage. This project included the complete interior demolition of existing office spaces and included the construction of new office spaces, conference rooms, study areas, and support zone with new finishes.

Alternative Delivery Method: None

Value: $

Milton, IL

Pathways for Student Success Office Renovations

Client: College of DuPage

Project Description:
The renovation and construction of the pedestrian tunnel at O’Hare International Airport (ORD). Work consisted of water infiltration remediation improvements and interior renovations to 10 pedestrian tunnels. This project was completed to put an end to Chicago Department of Aviation constant maintenance of the tunnel.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Pedestrian Tunnel Renovations

Client: Chicago Department of Aviation

Project Description:
The demolition of the existing Fairfax County Police Department Heliport and construction of a new facility in the same location including a 23,000 SF building that incorporates a helicopter maintenance bay, aircraft and vehicle fuel stations, crew office & living quarters, and other associated site improvements in the immediate vicinity.

Alternative Delivery Method: CM@Risk

Value: $$

Fairfax, VA

Police Heliport

Client: Fairfax County Department of Public Works & Environmental Services

Project Description:
The construction of a 5,000 SF precast addition to house a new pool at the park district facility. F.H. Paschen also replaced the existing HVAC system, renovated the weight rooms, expanded and modified the locker room, and added new bathrooms and saunas.

Alternative Delivery Method: CM@Risk

Value: $

Chicago Heights, IL

Pool Addition and Mechanical Upgrades

Client: Chicago Heights Park District

Project Description:
The interior renovation of the 4,000 SF fifth floor for UIC Hospital. This project included the demolition of the space and construction of 10 new private rooms with ADA restrooms. Each room has an individual induction unit to better provide patients with personal care.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Postpartum Renovation

Client: University of Illinois Health Systems

Project Description:

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

PR6 Renovations

Client: Rush University Medical Center

Project Description:
The 65,000 SF renovation project that provided enhancements to the overall library experience and improvements to the building. Project was completed in multiple phases so the library could remain operational throughout construction.

Alternative Delivery Method: Design-Bid-Build

Value: $

Palatine, IL

Public Library Renovations

Client: Palatine Public Library District

Project Description:
The track renewal at Francisco, Kedzie, and Rockwell. All three stations received track renewal, replacement of all ties and rail assemblies, along with the ballast below the bottom of new ties; running rails on tracks 1 and 2 to the West of the grade crossing; and all ROW signage.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Ravenswood Ballasted Track Improvements

Client: Chicago Transit Authority

Project Description:
The removal and replacement of the inbound and outbound recirculation bridge of the main parking garage at O’Hare International Airport (ORD). This project also included drainage and electrical on the roadway under the bridge.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Recirculation Bridge Replacement

Client: Chicago Department of Aviation

Project Description:
The renovation and rehabilitation of WMATA’s headquarters in Washington, D.C after a fire. Renovations included new furniture, electrical, and remediated all smoke damage. F.H. Paschen rehabilitated and renovated the fire-damaged building within an accelerated four-month schedule.

Alternative Delivery Method: None

Value: $$

Washington, DC

Restoration of Jackson Graham Building

Client: Washington Metropolitan Area Transit Authority

Project Description:
The interior renovation of a healthcare clinic for the University of Chicago Medical Center in River East Chicago. The project included adding more exam rooms and an expansion of the infusion clinic.

Alternative Delivery Method: None

Value: $

Chicago, IL

River East Renovation

Client: University of Chicago Medical Center

Project Description:
The construction of a new facility, as well as renovations to three other buildings at the Metra 47th Street Yard support facility located on Metra’s Rock Island District line.

Alternative Delivery Method: Design-Bid-Build

Value: $$$

Chicago, IL

Rock Island District 47th St. Yard Renovations

Client: Metra / Northeast Illinois Railroad Corp

Project Description:
The construction of lengthening the runway 9R-27L at O’Hare International Airport (ORD). This package included work to associated taxiways, earth work, storm sewer, electrical, and taxiway and runway pavement construction.

Alternative Delivery Method: None

Value: $$$

Chicago, IL

Runway 9R-27L Extension

Client: Chicago Department of Aviation

Project Description:
The renovation of the Southwest Airlines Cargo building at General Mitchell International Airport (MKE). This airside project was completed as a multi-phased, the first phase consisted of renovating the locker rooms and new ATO office. The second phase focused on the renovation of old ATO and BSO office.

Alternative Delivery Method: None

Value: $

Milwaukee, WI

Station Improvements

Client: Southwest Airlines

Project Description:
The demolition of a 71,000 SF satellite fuel facility and removal of eighteen 50,000-gallon underground storage tanks that housed jet fuel for Terminals 2, 3 and 5. This design-build project was completed on an operational airfield at O’Hare International Airport.

Alternative Delivery Method: None

Value: $$

Chicago, IL

Super Satellite Decommissioning

Client: ORD Fuel Company

Project Description:
The renovation of the 17,000 SF training center to provide office space and an emergency dispatch center. This project also included a new 6,500 SF addition for regulatory training, safety training and appliance training areas.

Alternative Delivery Method: Design-Build

Value: $

Chicago, IL

Support Services

Client: Private Client

Project Description:
The rehabilitation of taxiway A at the Gary Chicago International Airport (GYY). This project was completed in two phases to remove, replace, mill, and pave taxiway A.

Alternative Delivery Method: Unit Price

Value: $$

Gary, IN

Taxiway “A” Rehabilitation – Phase 1 & 2

Client: Gary Chicago International Airport

Project Description:
The pavement removal, subgrade improvements, new apron paving work at gates adjacent to the new East Extension of Terminal 5 Concourse M and the existing Terminal 5 gates. This project also consisted of building concrete work for the new East extension of Terminal 5 Concourse M and the expansion of the existing Terminal 5 building.

Alternative Delivery Method: None

Value: $$$

Chicago, IL

Terminal 5 Infrastructure

Client: Austin Powers Partners

Project Description:
The renovation of 12,760 SF of existing men’s and women’s restrooms. This included nine project sites within O’Hare International Airport’s (ORD) Terminal 1 and Terminal 3.

Alternative Delivery Method: Design-Bid-Build

Value: $$

Chicago, IL

Terminal Restroom Modernization

Client: Chicago Department of Aviation

Project Description:
The construction of a pre-engineered metal building with a 46-foot-tall, 69,618 SF substation with a 204-foot clear span. Work at the Russet East substation included the construction of a pre-engineered metal building with a 35-foot-tall, 22,470 SF switching station with a 57-foot clear span.

Alternative Delivery Method: None

Value: $$

Baltimore, MD

Tipton & Russet East GIS Enclosures

Client: Confidential Client

Project Description:
The interior renovation to provide functional and aesthetic upgrades to meet the needs of the new Wellness Office department for Rush University Medical Center. Renovations included a private meeting space, conference rooms, a lounge, kitchen, and office spaces with a focus on acoustics and rich interior finishes.

Alternative Delivery Method: Design-Bid-Build

Value: $

Chicago, IL

Wellness Office

Client: Rush University Medical Center

Project Description:
The multi-phased construction of a new road between the Loop and Chinatown. The project will also realign Wentworth Ave. between Archer and Cermak to bring this part of Wentworth in line with the part of Wentworth south of Cermak Rd. The realignment of Wentworth Ave. will greatly improve safety for both motorists and pedestrians while forming better links between New Chinatown Square and the traditional Chinatown south of Cermak Road.

Alternative Delivery Method: Design-Build

Value: $$$

Chicago, IL

Wells-Wentworth Connector

Client: Chicago Department of Transportation

[{"project_ID":8381,"project_name":"Wildlife Perimeter Dig Defence","project_location":"Atlanta, GA","project_region":"Southeast","project_description":"The installation of a wildlife deterrent fencing system known as \u201cdig defence.\u201d This system is placed along the airport\u2019s perimeter fence below subgrade to prevent wildlife from interfering with runaway activities. The total amount of fencing being placed is about 40,000 linear feet.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1805-005_City-of-Atlanta-Wildlife-Perimeter-Dig-Defence-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1805-005_City-of-Atlanta-Wildlife-Perimeter-Dig-Defence-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1805-005_City-of-Atlanta-Wildlife-Perimeter-Dig-Defence-3-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Job Order Contracting","project_award":"","project_client":"City of Atlanta","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1805-005_City-of-Atlanta-Wildlife-Perimeter-Dig-Defence-1-672x372.jpg"},{"project_ID":8399,"project_name":"Western Trails Elementary Renovations","project_location":"Carol Stream, IL","project_region":"Midwest","project_description":"The renovation of an existing learning resource center into a brand-new state of the art Innovation Center. The project also consisted of MEP and roofing upgrades to the entire building as well as locker room renovations at two separate middle schools.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/western-trails-elementary-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/western-trails-elementary-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/western-trails-elementary-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/western-trails-elementary-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/western-trails-elementary-5.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/western-trails-elementary-6.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Community Consolidated School District 93","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/western-trails-elementary-2-672x372.jpg"},{"project_ID":8478,"project_name":"West Lake Corridor","project_location":"Hammond to Munster, IN","project_region":"Great Lakes","project_description":"The design-build extension of the South Shore Line to reach high-growth areas in Lake County, IN. Proposed service would involve the operation of commuter rail electric trains to Dyer, Munster, and Hammond that would serve Metra\u2019s Millennium Station in Downtown Chicago. This project is being completed through a joint venture between F.H. Paschen and Ragnar Benson with Jacobs as the designer.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/west-lake-corridor-1.png?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/west-lake-corridor-2.png?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/west-lake-corridor-3.png?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Northern Indiana Commuter Transportation District","project_sector":["Heavy Civil","Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/west-lake-corridor-3-672x372.png"},{"project_ID":8428,"project_name":"Welcome Atrium","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The multi-phased construction of a new 12,000 SF two-story lobby and renovations to 8,000 SF of adjacent spaces at the University of Illinois at Chicago Hospital. The lobby will include a custom designed reception desk, elevators to the 2nd Floor, seating areas and planters. The second floor will include a contemplation space, a Pastoral Care Suite, and modifications to existing spaces to allow for future bridge connection to a future building to be constructed directly across from the hospital.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-Welcome-Atrium-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-Welcome-Atrium-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-Welcome-Atrium-3.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois Health Systems","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-Welcome-Atrium-1-672x372.jpg"},{"project_ID":8420,"project_name":"Walter Payton College Prep Annex & Renovation","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of a three-story, 49,000 SF addition to Walter Payton College Prep. Work also included site development and interior renovations of the existing facility. The school features general and specialty classrooms, lounge\/cafe, multi-purpose Blackbox theater, admin offices, weight and fitness room, full-size gymnasium with gym lockers & offices.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/WPCP-Annex-Renovation-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/WPCP-Annex-Renovation-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/WPCP-Annex-Renovation-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/WPCP-Annex-Renovation-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/WPCP-Annex-Renovation-5.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"Chicago Building Congress \u2013 Merit Winner \u2013 New Construction Chicago Under $55M","project_client":"Public Building Commission","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/WPCP-Annex-Renovation-5-672x372.jpg"},{"project_ID":8501,"project_name":"Union Station Transit Center","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of a 47,875 SF new transit center next to Union Station. Work included a new tunnel connecting to the existing Amtrak pedway, an entrance with a staircase leading from street level to the tunnel, a freestanding building for bathroom facilities, CTA bus islands with canopies, fare collection machines, station support rooms, communications and security systems, lighting, signage, & architectural finishes.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Station-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Terminals-and-Platforms.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Terminals-Day.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Platform.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Platform-Finishes-Detailed.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Station-Entrance-Back.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Terminals-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Terminals-Long-View-Night.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Chicago Department of Transportation","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Union-Station-Transit-Center-Station-Entrance-672x372.jpg"},{"project_ID":8408,"project_name":"Skinner West Elementary School Annex","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of a new 36,000 SF four-story addition to the Skinner West Elementary School which included 19 classrooms, a science lab, art room, computer lab, and multipurpose rooms.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Skinner-West-Elementary-School-Annex-Exterior.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Skinner-West-Elementary-School-Annex-Classroom.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Skinner-West-Elementary-School-Annex-Blue-Hallway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Skinner-West-Elementary-School-Annex-Hallway-and-Bathroom.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Skinner-West-Elementary-School-Annex-Hallway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Skinner-West-Elementary-School-Annex-Science-Lab.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Public Building Commission","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Skinner-West-Elementary-School-Annex-Exterior-672x372.jpg"},{"project_ID":8411,"project_name":"Sarah E. Goode STEM Academy","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of a 207,000 SF institution designed to prepare students for technology jobs of the future. The new design includes a natatorium with an Olympic-sized swimming pool, a gymnasium, an auditorium, a full kitchen, administrative offices, a library, science labs, classrooms, and computer labs. Technological innovations, which helped establish the building\u2019s LEED platinum status, include a geo-exchange heat pump system, a solar thermal hot water heating system, low-flow fixtures, and recycled and locally sourced materials. Outdoor features include walking paths, a community garden, a learning garden, and two rain gardens for storm-water control. There is also a new football field with a track, baseball field, softball field, and tennis courts constructed on the school\u2019s campus to the north of the building.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Exterior-Front.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Exterior-Side.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Exterior-Far.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Exterior-Courtyard.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Interior-Collaborative-Space.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Interior-Hallway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Interior-Library.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Interior-Pool.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Exterior-Track-Football-Field.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Aerial.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2014 \u2013 American Society of Landscape Architect \u2013 President\u2019s Award \u2013 Design-Constructed Projects \/ Institutional \r\n2013 \u2013 CISCO \u2013 Pride in Construction Project of the Year \u2013 New Construction \u2013 Chicago (over $20 million) Category \r\n2013 \u2013 Chicago Association of Realtors Good Neighbor Award \r\n2013 \u2013 Brick in Architecture \u2013 Gold for Education \r\n2013 \u2013 American Society of Heating, Refrigerating & Air-Conditioning Engineers \u2013 Engineering of Excellence Award \r\n2013 \u2013 Friends of the Chicago River \u2013 Green Ribbon Award \r\n2013 \u2013 Learning by Design \u2013 Publisher\u2019s Commendation Award ","project_client":"Public Building Commission","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Sarah-E.-Goode-STEM-Academy-Exterior-Front-672x372.jpg"},{"project_ID":8513,"project_name":"Harrison-Dever Crib Complex Structural Renovations","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The structural renovations to the Harrison-Dever Intake Crib, the largest intake crib in the Department of Water Management's water treatment system.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/IMG_2064-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/IMG_2069-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/IMG_2072-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/FHP-Water-Crib-Aerial-2017-Final.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2018: Engineering News Record (ENR) - Best Project Award, Small Projects (under $10M)\r\n2017: International Concrete Repair Institute \u2013 Project of the Year","project_client":"Chicago Department of Water","project_sector":[],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/FHP-Water-Crib-Aerial-2017-Final-672x372.jpg"},{"project_ID":8500,"project_name":"Green Line Cermak Road – Elevated Station","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of the new Cermak Road elevated station on the CTA\u2019s Green Line. Work included the building of a new station with three entrances, one center platform, two elevators, stairs, station support rooms, communications and security systems, platform canopies and enclosures for weather protection, bike racks, signage, a fare collection machine, customer assistant booths, and several architectural finishes.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Green-Line-Cermak-Road-Elevated-Station-Station-Platform-Train-Passing-City-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Green-Line-Cermak-Road-Elevated-Station-Station-Platform-Dusk.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Green-Line-Cermak-Road-Elevated-Station-North-Station-Platform.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Green-Line-Cermak-Road-Elevated-Station-Outdoor-Station-Platform-City-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Green-Line-Cermak-Road-Elevated-Station-Outdoor-Station-Platform-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Green-Line-Cermak-Road-Elevated-Station-Station-Platform-Train-Passing.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2016: American Public Works Association \u2013 Project of the Year, Structures $25M, but less than $75M \r\n2016: American Public Works Association \u2013 National Award \u2013 Project of the Year Structures $25M to $75M ","project_client":"Chicago Department of Transportation","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Green-Line-Cermak-Road-Elevated-Station-Station-Platform-Train-Passing-City-View-672x372.jpg"},{"project_ID":8410,"project_name":"Galewood Charter School","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The design-build of a 56,000 SF three-story steel and precast structure\u202fbuilding which houses classrooms and offices. The project was designed, bid, and built by F.H. Paschen and design partner, UrbanWorks. This project achieved LEED Silver.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Exterior-with-Sign.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Exterior-Full.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Exterior-Side-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Exterior-Side-Playground.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Chater-School-Interior-Lobby.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Interior-Classroom-Hallway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Interior-Classroom.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Interior-Learning-Space.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Interior-Seating.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Interior-Gym.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Build","project_award":"2016 \u2013 Chicago Athenaeum: Museum of Architecture & Design \u2013 The American Architectural Awards 2016 \r\n2013 \u2013 Association of Licensed Architects \u2013 Design Award Gold Medal \r\n2013 \u2013 Chicago Building Congress \u2013 Merit Award Finalist \r\n2013 \u2013 Richard Driehaus Foundation \u2013 Finalist for Award","project_client":"United Neighborhood Organization (UNO)","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UNO-Galewood-Charter-School-Exterior-with-Sign-672x372.jpg"},{"project_ID":8505,"project_name":"Dulles Corridor Metrorail Project Phase 1: Station Finishes and Specialties","project_location":"Tysons Corner, VA","project_region":"Mid-Atlantic","project_description":"The finishes for five metro stations on the new Silver Line that connects Washington D.C. to Loudon County in Virginia via Washington Dulles International Airport.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Wiehle-Reston-East-Station-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Station-Interior.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Station-Elevator.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Wiehle-Reston-East-Station-Platform.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Escalators.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Spring-Hill-Station-Canopy.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Greensboro-Station.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Information.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-East-Falls-Church-Station-Platform.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Spring-Hill-Station-Platform.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Signage.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2013: Dulles Transit Partners \u2013 Safety Recognition Award","project_client":"Metropolitan Washington Airports Authority","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Dulles-Corridor-Metro-Rail-Project-Phase-1-Station-Finishes-and-Specialties-Wiehle-Reston-East-Station-Entrance-672x372.jpg"},{"project_ID":8403,"project_name":"Dirksen Elementary School Annex & Renovations","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of a 65,000 SF annex added to the existing one-story elementary school. The annex included 30 classrooms, 2 administrative offices, a library\/media center, multi-purpose dining room, hybrid kitchen & kitchen server, kitchen office, building storage, utility rooms, and elevator. This project was delivered using the Construction Manager at Risk delivery method by F.H. Paschen and joint venture partner Bowa Construction.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Dirksen1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Dirksen2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Dirksen4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Dirksen5-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Dirksen6-scaled.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"CM@Risk","project_award":"2020: LEED v4 Silver\u00a0","project_client":"Public Building Commission","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Dirksen1-672x372.jpg"},{"project_ID":8499,"project_name":"Dearborn Subway – Grand, Chicago, and Divison Station Improvements","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The renovation of the existing CTA Blue Line subway stations at Grand, Chicago, and Division. Work consisted of new station entrance canopies, new structural glazed tile, electrical service upgrades, new LED lighting and communications, new roto-gates, and refurbishing of all existing finishes.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Grand-Street-Entrance-Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Chicago-Ave.-Entrance-Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Division-Street-Entrance-Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Mezzanine-Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Platform-Rendering.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Chicago Department of Transportation","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Chicago-Ave.-Entrance-Rendering-672x372.jpg"},{"project_ID":8503,"project_name":"Dan Ryan Red Line Station Improvements","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The improvements to the 40-year-old CTA Red Line South Branch between Cermak and 95th street. F.H. Paschen undertook improvements at eight stations; improvements included new paint, lighting, benches and bike racks, and the installation of three new elevators at Garfield, 63rd, and 87th, making these stations ADA accessible.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Red-Line-Dan-Ryan-Station-Improvements-87th-Street.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Red-Line-Dan-Ryan-Station-Improvements-79th-Street.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Red-Line-Dan-Ryan-Station-Improvements-69th-Street-Close-Up.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Red-Line-Dan-Ryan-Station-Improvements-69th-Street.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Red-Line-Dan-Ryan-Station-Improvements-55th-Street.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2014: March of Dimes \u2013 Transportation Project of the Year \r\n2014: American Council of Engineering Companies, Illinois \u2013 Engineering Excellence Award \u2013 Eminent Conceptor ","project_client":"Chicago Transit Authority","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Red-Line-Dan-Ryan-Station-Improvements-87th-Street-672x372.jpg"},{"project_ID":8401,"project_name":"Cloverdale Elementary School Renovations","project_location":"Carol Stream, IL","project_region":"Midwest","project_description":"The renovation of the school\u2019s Learning Center into a new Innovation Center. This project also consisted of a front entry vestibule and main office renovations.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Arcon-Cloverdale-MKrausPhoto-026-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Arcon-Cloverdale-MKrausPhoto-015-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Arcon-Cloverdale-MKrausPhoto-032-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Arcon-Cloverdale-MKrausPhoto-037-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Arcon-Cloverdale-MKrausPhoto-006-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Community Consolidated School District 93","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Arcon-Cloverdale-MKrausPhoto-015-672x372.jpg"},{"project_ID":8372,"project_name":"Checked Baggage Inspection System (CBIS)","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The demolition and reconstruction of the existing B\/C Tunnel pavement expansion joints and drip tray systems at the interfaces with Concourses B & C at O\u2019Hare International Airport (ORD). This project took place on an active airfield and required coordinated gate closures with United Airlines and the Chicago Department of Aviation.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/6-29-2022-OHare-T3-CBIS-Brian-Fritz-Photography-9-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/6-29-2022-OHare-T3-CBIS-Brian-Fritz-Photography-20-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/6-29-2022-OHare-T3-CBIS-Brian-Fritz-Photography-3-scaled.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"American Airlines","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/6-29-2022-OHare-T3-CBIS-Brian-Fritz-Photography-9-672x372.jpg"},{"project_ID":8456,"project_name":"Bridgeview Courthouse Renovations","project_location":"Bridgeview, IL","project_region":"Midwest","project_description":"The build-out of tenant improvements at the Bridgeview Courthouse. The project includes 15,146 SF of interior demolition and buildout. Two enabling spaces are included with the above square footage and pertain to the relocation and remodeling of spaces for the Assessor's Office and Sheriff's Offices located in adjacent areas to CCDPH.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/2524_Bridgeview-Courthouse-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/2524_Bridgeview-Courthouse-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/2524_Bridgeview-Courthouse-5-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/2524_Bridgeview-Courthouse-6-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Cook County Hospital & Health System","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/2524_Bridgeview-Courthouse-2-672x372.jpg"},{"project_ID":8389,"project_name":"Armour Wetlab Renovation","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The interior renovation of a 2,000 SF of a laboratory classroom for Rush University. Renovations included the replacement of bio-safety hoods, replacement of classroom work surfaces, flooring and ceiling replacements, new openings, and MEP upgrades.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Rush-722-Lab20190822_0014-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Rush-722-Lab20190822_0011-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Rush-722-Lab20190822_0006-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Rush-722-Lab20190822_0004-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Rush-722-Lab20190822_0003-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Rush University Medical Center","project_sector":["Education","Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Rush-722-Lab20190822_0006-scaled-672x372.jpg"},{"project_ID":8400,"project_name":"Administration Building Renovations","project_location":"Carol Stream, IL","project_region":"Midwest","project_description":"The addition of a 3,100 SF addition to the Administration Center. The project included a new Board Room, Conference Room, and Storage Room. The following trade packages were included: site demolition, earthwork, site utilities, asphalt, landscaping, structural steel, carpentry, fireproofing, roofing, glazing, flooring, painting, signage, casework, window shades, specialties, mechanical, electrical, plumbing, and fire suppression. ","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Front-Entrance4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Board-Room4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Conference-Room7-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Doors-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Community Consolidated School District 93","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Front-Entrance4-672x372.jpg"},{"project_ID":8459,"project_name":"71st Street Underpass Rehab","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The reconstruction of the railroad bridge, which had fallen into disrepair located near 71st street west of Cottage Grove Ave. A temporary shoring system was installed to support the main bridge members allowing work to safely proceed on the bridge.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/2018-09-25-11_06_36-0500-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/2018-09-25-14_05_54-0500-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/2018-09-26-11_57_58-0500-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/2018-08-08-07_34_49-0500-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Unit Price","project_award":"","project_client":"Norfolk Southern Corporation","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/2018-09-25-11_06_36-0500-672x372.jpg"},{"project_ID":10533,"project_name":"Auto Draft","project_location":null,"project_region":null,"project_description":null,"project_gallery_ids":null,"project_value":null,"project_alternative_delivery":null,"project_award":null,"project_client":null,"project_sector":null,"project_thumbnail_url":false},{"project_ID":8463,"project_name":"41st Street Pedestrian Bridge Over South Lake Shore Drive","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a 1,350-foot-long bike and pedestrian bridge. This bridge provides Chicago\u2019s Bronzeville neighborhood direct access to the lakefront and specifically the Oakwood\/41st Street beach.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/41st-Street-Pedestrian-Bridge-Over-South-Lake-Shore-Drive-Bridge-at-Night-Summer.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/41st-Street-Pedestrian-Bridge-Over-South-Lake-Shore-Drive-Bridge-Details.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/41st-Street-Pedestrian-Bridge-Over-South-Lake-Shore-Drive-Bridge-Under.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/41st-Street-Pedestrian-Bridge-Over-South-Lake-Shore-Drive-Bridge-with-City.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/41st-Street-Pedestrian-Bridge-Over-South-Lake-Shore-Drive-Bridge-with-Lake.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2019: Structural Engineers Association of Illinois (SEAOI) - Execellence in Structural Engineering \u2013 Best Project\r\n2019: American Society of Civil Engineers (ASCE) - Outstanding Civil Engineering Achievement $10-35M \r\n2019: National Council of Structural Engineers Association (NCSEA) - Excellence in Structural Engineering \r\n2019: Road & Bridges - #3 Bridge Project of 2019 \r\n2019: Construction Management Association of America (CMAA) - Chicago Chapter Achievement Award \r\n2019: Construction Management Association of America (CMAA) - National Award \u2013 Transportation: Construction less than $50M \r\n2019: ENR \u2013 Best of the Midwest Project Award, Landscape and Urban Development \r\n2019: Chicago Buidling Congress \u2013 Merit Award Winner \r\n2018: Chicago Department of Transportation (IRTBA) - Contractor of the Year ","project_client":"Chicago Department of Transportation","project_sector":["Heavy Civil","Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/41st-Street-Pedestrian-Bridge-Over-South-Lake-Shore-Drive-Bridge-at-Night-Summer-672x372.jpg"},{"project_ID":8430,"project_name":"1st and 2nd Floor Hospital Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation of the first and second floor of Stroger Hospital. This project involved renovating 30,000 SF of the existing area to provide programmatic space for pharmacy, public safety, and outpatient clinic functions.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-and-2nd-Floor-Hospital-Renovations-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-and-2nd-Floor-Hospital-Renovations-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-and-2nd-Floor-Hospital-Renovations-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-and-2nd-Floor-Hospital-Renovations-4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-and-2nd-Floor-Hospital-Renovations-5-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Cook County Hospital & Health System","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-and-2nd-Floor-Hospital-Renovations-2-672x372.jpg"},{"project_ID":8436,"project_name":"1st Floor Hospital Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation of over 25,000 SF of the Norwegian American Hospital. This project was completed in 22 individual phases and seeks to create a warm and welcoming environment reflecting the quality of the care provided within, as well as cohesive defining a cohesive way finding strategy throughout the first floor.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-Floor-Hospital-Renovations-HPH-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-Floor-Hospital-Renovations-HPH-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-Floor-Hospital-Renovations-HPH-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-Floor-Hospital-Renovations-HPH-4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-Floor-Hospital-Renovations-HPH-5-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"2021: AIA Chicago \u2013 Interior Architecture Award \u2013 Special Recognition for Radical Resourcefulness","project_client":"Humboldt Park Health","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/1st-Floor-Hospital-Renovations-HPH-1-672x372.jpg"},{"project_ID":8467,"project_name":"18th Street Bascule Bridge Rehab","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The rehabilitation of the 47-year-old movable bascule bridge. Work included new roadway, sidewalk decks, repaired truss, floor beams, lateral bracing, and upgraded electrical and navigational lighting.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/4-22-2015-18Th-Street-Bridge-2_smaller.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/IMG_6941_smaller.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/IMG_7010_smaller.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/18-Street-Bascule-Bridge-Rehab-Bridge-Torch-Cutting.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/18-Street-Bascule-Bridge-Rehab-Bridge-Torch-Cutting-View-From-River.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/18-Street-Bascule-Bridge-Rehab-Bridge-Deck-Removal.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Illinois Department of Transportation","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/18-Street-Bascule-Bridge-Rehab-Finished-Bridge-Deck-672x372.jpg"},{"project_ID":8404,"project_name":"2020 Summer Renovations","project_location":"Roselle & Hanover Park, IL","project_region":"Chicago","project_description":"The renovations of Greenbrook Elementary, Waterbury Elementary and Spring Wood Middle Schools over two summers. The existing libraries were transformed into more open and collaborative innovation centers, including break out rooms, meeting spaces, and STEM classrooms.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Keeneyville-2020-Summer-Renovations-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Keeneyville-2020-Summer-Renovations-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Keeneyville-2020-Summer-Renovations-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Keeneyville-2020-Summer-Renovations-4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Keeneyville-2020-Summer-Renovations-5-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Keeneyvillle School District 20","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Keeneyville-2020-Summer-Renovations-2-672x372.jpg"},{"project_ID":8451,"project_name":"3rd Floor Government Center Renovation","project_location":"Leesburg, VA","project_region":"Mid-Atlantic","project_description":"The multi-phased office renovation that included electrical, HVAC, low voltage, and security upgrades as well as new sound masking systems.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Loudon-County-3rd-Floor-Renovations-1-scaled.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Loudon-County-3rd-Floor-Renovations-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Loudon-County-3rd-Floor-Renovations-3-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Loudoun County","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Loudon-County-3rd-Floor-Renovations-3-672x372.jpg"},{"project_ID":8431,"project_name":"3rd Floor Hospital Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The multi-phased renovation of the 17,000 SF third floor of Stroger hospital. Phase one consisted of renovating an existing on-call and breakroom area into a fully serviceable pre-op center for patients. Phase two consisted of building-out new offices and conference room space and a new innovative area. Phase three involved converting existing office space into a multi-patent testing and exam area.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Cook-County-3rd-Floor-Hospital-Renovations-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Cook-County-3rd-Floor-Hospital-Renovations-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Cook-County-3rd-Floor-Hospital-Renovations-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Cook-County-3rd-Floor-Hospital-Renovations-4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Cook-County-3rd-Floor-Hospital-Renovations-5-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Job Order Contracting","project_award":"","project_client":"Cook County Hospital & Health System","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Cook-County-3rd-Floor-Hospital-Renovations-3-672x372.jpg"},{"project_ID":8479,"project_name":"43rd Street Pedestrian Bridge Over South Lake Shore Drive","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a bike and pedestrian bridge. The new overpass, with a curvy design similar to the one completed at 41st Street, will allow wheelchair users, bicyclists and emergency vehicles to cross Lake Shore Drive.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/43rd-Street-Pedestrian-Bridge-S-LSD-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/43rd-Street-Pedestrian-Bridge-S-LSD-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/43rd-Street-Pedestrian-Bridge-S-LSD-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/43rd-Street-Pedestrian-Bridge-S-LSD-4-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Transportation","project_sector":["Heavy Civil","Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/43rd-Street-Pedestrian-Bridge-S-LSD-4-672x372.jpg"},{"project_ID":8433,"project_name":"5 Atrium OR Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation and installation of new equipment to three operating rooms at the Rush University Medical Center Atrium building. The construction work was completed in multiple shifts while neighboring operating rooms remained in operation.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/5-Atrium-OR-Renovations-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/5-Atrium-OR-Renovations-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/5-Atrium-OR-Renovations-3-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Rush University Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/5-Atrium-OR-Renovations-2-672x372.jpg"},{"project_ID":8496,"project_name":"95th Street Terminal Improvement Project","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The design-build of a new passenger terminal on the south side of 95th Street Station and renovated and built an addition for the existing passenger terminal on the north side of 95th Street. A new pedestrian bridge over 95th Street was constructed, joining the north and south passenger terminals. 95th Street was also widened in both directions to accommodate new dedicated bus lanes, and a new bus bridge over the Dan Ryan\/CTA Red Line was constructed.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-From-Expressway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-New-Terminal-From-Expressway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Pedestrian-Bridge.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-View-From-Bus-Stops.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Main-Entrance-Dusk.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Main-Entrance-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Aerial-Drone-View-with-City-.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Aerial-Drone-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Interior-Station-Escalators.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Interior-South-Station.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Exterior-Pedestrian-Bridge-and-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Train-Platforms-and-Expressway-Night.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"2021: AIA Chicago \u2013 Divine Detail Award \r\n2020: American Council of Engineering Companies (ACEC) - Honor Award, Transportation\r\n2020: American Council of Engineering Companies (ACEC) - National Recognition Award \r\n2020: AIA Illinois \u2013 Mies van der Rohe Award for Innovation in Overall Concept & Design \r\n2020: Architecture MasterPrize \u2013 The Architecture MasterPrize Award, Transportation Category\r\n2019: Interior Design \u2013 Best of the Year Award \r\n2019: AIA Chicago \u2013 Distinguished Building Award\u00a0\r\n2019: Federation of Women Contractors (FWC) - 2019 Project of the Year Award\r\n2018: Women in Transportation \u2013 Innovative Project of the Year ","project_client":"Chicago Transit Authority","project_sector":["Heavy Civil","Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/95th-Street-CTA-Terminal-Improvement-Project-Main-Entrance-Night-672x372.jpg"},{"project_ID":8390,"project_name":"Administrative Building Remodel","project_location":"Glen Ellyn, IL","project_region":"Chicago","project_description":"The renovation of the Early Childhood Learning Center into the College of DuPage\u2019s Administrative Office Building. In addition to the new office spaces and conference rooms, a complete replacement of the building\u2019s mechanical system was completed.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/COD_View02-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/17-6-22Img28184A-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/1706-22Img28152-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/1706-22Img28159-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/1706-22Img28172-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/1706-22Img28205-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/1706-22Img28224-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"2021: Chicago Building Congress \u2013 Merit Award Finalist","project_client":"College of DuPage","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/1706-22Img28237A-scaled-672x372.jpg"},{"project_ID":8369,"project_name":"Admiral’s Club and Flagship Lounge","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The redesign and renovation of levels one, two, and three of the American Airlines Admirals Club in Terminal 3 at O\u2019Hare International Airport (ORD). The space was renovated with high-end furnishings and finishes, two full kitchens, increased bar capacity, and lighting and thermal comfort improvements to provide an improved overall member experience.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Admirals-Club-Work-Space.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Admirals-Club-Seating.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Admirals-Club-Luxury-Seating-Area.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Admirals-Club-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Admirals-Club-Dining-Buffet.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Admirals-Club-Dining-Area.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Integrated Project Delivery","project_award":"2020: Illuminating Engineering Society \u2013 Illumination Award of Merit \r\n2018: CISCO \u2013 Project of the Year Finalist","project_client":"American Airlines","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Admirals-Club-Dining-Area-672x372.jpg"},{"project_ID":8370,"project_name":"Air Rescue Fire Fighting Facility (ARFF)","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new 25,000 SF firehouse for the Chicago Fire Department O\u2019Hare Airport Operations Division. The building consists of 15,000 SF of living, dining, training, recreation, dormitory, locker, and office space, and four drive-through vehicle apparatus bays capable of accommodating eight vehicles and equipment staging and maintenance.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-ARFF-Replacement-Facility-Exterior-Front.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-ARFF-Replacement-Facility-Exterior-Side.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-ARFF-Replacement-Facility-Exterior-Back.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-ARFF-Replacement-Facility-Exterior-with-Vehicle.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-ARFF-Replacement-Facility-Garage.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-ARFF-Replacement-Facility-Kitchen-and-Dining.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-ARFF-Replacement-Facility-Classroom.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"Association of Licensed Architects \u2013 Merit Award","project_client":"Chicago Department of Aviation","project_sector":["Aviation","Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-ARFF-Replacement-Facility-Exterior-Front-672x372.jpg"},{"project_ID":8380,"project_name":"Airport Canopies","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The multi-phased construction of an outdoor canopy expanding from Terminal 1 all the way through Terminal 3. This project was completed overnight to minimize disruption to daily airport operations. ","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/airport-canopies-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/airport-canopies-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/airport-canopies-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/airport-canopies-4.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/airport-canopies-4-672x372.jpg"},{"project_ID":8371,"project_name":"Airport Maintenance Complex","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of an 88,000 SF vehicle Maintenance facility at O\u2019Hare International Airport (ORD) for the Chicago Department of Aviation. The building contains several service bays, offices, restrooms, as well as a mezzanine storage area with roof access.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-Maintenance-Complex-Expansion-Exterior-Doors.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-Maintenance-Complex-Expansion-Exterior.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-Maintenance-Complex-Expansion-Interior-Doors.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-Maintenance-Complex-Expansion-Interior-Fleet-Row.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-Maintenance-Complex-Expansion-Interior-Fleet.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-Maintenance-Complex-Expansion-Exterior-Doors-672x372.jpg"},{"project_ID":8450,"project_name":"Alternate Headquarters","project_location":"Allen, TX","project_region":"South","project_description":"The construction of a new USPS Facility in Allen, Texas. The structural steel building houses a post office that serves the public, a postal processing center, a Postmaster office, and conference rooms. The project also included a new lobby area that has a storefront entrance with automatic door openers.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Alternate-HQ-Allen-1-scaled.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Alternate-HQ-Allen-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Alternate-HQ-Allen-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Alternate-HQ-Allen-4.png?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Alternate-HQ-Allen-5-scaled.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"United States Post Office Southern Facilities","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Alternate-HQ-Allen-5-672x372.jpg"},{"project_ID":8395,"project_name":"Arthington Mall Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation of UIC\u2019s Arthington Mall. This project included extensive site work and landscaping. Sustainable features include stormwater bioinfiltration, permeable surfaces, and 11,000 SF rain gardens. Arthington Mall is the first SITES-Certified university space in Illinois.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/uic_JCL7831.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/uic_JCL7877.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/uic_JCL7957.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois - Chicago","project_sector":["Education","Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/uic_JCL7831-672x372.jpg"},{"project_ID":8477,"project_name":"Algoquin Bypass","project_location":"Algoquin, IL","project_region":"Chicago","project_description":"The construction of 2.11 miles of a four-lane divided highway, a diamond interchange, four new bridges, 11 retaining walls, and one noise abatement wall. Most of the project involved construction of a new highway around the downtown area of Algonquin, IL as well as the reconstruction of the existing Route 31 Main Street.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Algonquin-Bypass-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Algonquin-Bypass-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Algonquin-Bypass-3-scaled.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"None","project_award":"","project_client":"Illinois State Toll Highway Authority","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Algonquin-Bypass-3-672x372.jpg"},{"project_ID":8409,"project_name":"Aspira Business and Finance High School","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new 80,000 SF four-story school. Exterior features include a variety of architectural facades including Fiber-C rain screen panels and a curtainwall glazing. Interior amenities include wireless access throughout and automated lighting control. The school contains 31 classrooms including two science labs and six computer labs, a full cooking kitchen and cafeteria, and media room.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Exterior-Side.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Exterior-Front.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Science-Lab.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Collaborative-Space.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Gym.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Hallway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Cafeteria.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Cafeteria-Seating.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"CM@Risk","project_award":"The project received LEED Gold Certification.","project_client":"Aspira of Chicago","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Aspira-Business-Finance-High-School-Exterior-Side-672x372.jpg"},{"project_ID":8522,"project_name":"Batch Plant Facility","project_location":"Des Plaines, IL","project_region":"Chicago","project_description":"The renovation of the existing site of one portable dry mix plant and one portable central mix plant to a state-of-the-art new facility consisting of three main structures: the plant building, primary aggregate building, and the secondary aggregate building. ","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Batch-Plant-Facility-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Batch-Plant-Facility-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Batch-Plant-Facility-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Batch-Plant-Facility-4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Batch-Plant-Facility-5-scaled.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Ozinga Ready Mix Concrete Inc.","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Batch-Plant-Facility-5-672x372.jpg"},{"project_ID":8385,"project_name":"Automated Transportation System (ATS) Extension","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of an ATS bridge on the landside at O\u2019Hare International Airport (ORD). This bridge extends the ATS from its current end point at Lot E to its new end point at the new joint use consolidated parking facility in what was Lot F.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Automated-Transportation-System-ExtensionATS-1-scaled.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Automated-Transportation-System-ExtensionATS-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Automated-Transportation-System-ExtensionATS-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Automated-Transportation-System-ExtensionATS-4-scaled.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Automated-Transportation-System-ExtensionATS-4-672x372.jpg"},{"project_ID":8504,"project_name":"Avondale Yard","project_location":"Atlanta, GA","project_region":"Southeast","project_description":"The replacement of six truck lifts which service MARTA\u2019s train fleet. Work included the removal of the existing lift equipment, removal and disposal of all hydraulic fluids and contaminated soils, creating 9 ft deep, 4 x 6 pit configuration by hand excavation and engineered shoring, installation of fiber glass caissons, providing flowable fill backfill material and concrete placement followed by the installation of the new Lift equipment.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Avondale-Yard-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Avondale-Yard-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Avondale-Yard-1-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Job Order Contracting","project_award":"","project_client":"Metropolitan Atlanta Rapid Transit Authority","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Avondale-Yard-4-672x372.jpg"},{"project_ID":8421,"project_name":"Belmont-Cragin Clinic","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a brand new two-story, 25,000 SF clinic in the Belmont-Cragin Neighborhood.\u00a0 This facility has 30 exam rooms and provides dental, social, and medical services.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/12\/Belmont-Cragin-Clinic-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/12\/Belmont-Cragin-Clinic-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/12\/Belmont-Cragin-Clinic-3.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Cook County Hospital & Health System","project_sector":["Healthcare","Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/12\/Belmont-Cragin-Clinic-1-672x372.jpg"},{"project_ID":8472,"project_name":"Bridge No. 98 Rehabilitation","project_location":"Noblesville, IN","project_region":"Great Lakes","project_description":"The rehabilitation of the bridge on East 209th Street over Morse Reservoir, found west of Hague Road in Noblesville Township, Hamilton County, Indiana. Due to the age, condition, and importance of this bridge the rehabilitation was completed quickly.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/12\/BridgeNo98-Rehabilitation01.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/12\/BridgeNo98-Rehabilitation02.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/12\/BridgeNo98-Rehabilitation04.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/BridgeNo98-Rehabilitation03.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Bridge No. 98 Rehabilitation","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/12\/BridgeNo98-Rehabilitation04-672x372.jpg"},{"project_ID":8465,"project_name":"Barrington Road Pedestrian Bridge and Access Building","project_location":"Hoffman Estates, IL","project_region":"Chicago","project_description":"The construction of the Pace Pedestrian Bridge over the Jane Addams Memorial Tollway (I-90) and the construction of the north and south bridge access buildings. This bridge provides access to and from the east and provides access to a Park-n-Ride station by Pace Bus.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Barrington-Road-Pedestrian-Bridge-and-Access-Building-Front-View-Close-Up.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Barrington-Road-Pedestrian-Bridge-and-Access-Building-Front-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Barrington-Road-Pedestrian-Bridge-and-Access-Building-Interior-Bridge.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Barrington-Road-Pedestrian-Bridge-and-Access-Building-Side-View.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2019: American Council of Engineering Companies of Illinois \u2013 ACEC Engineering Excellence Award","project_client":"Illinois State Toll Highway Authority","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Barrington-Road-Pedestrian-Bridge-and-Access-Building-Front-View-672x372.jpg"},{"project_ID":8502,"project_name":"Blue Line Five Station Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The design-build for renovations and repairs to five Blue Line stations: Addison, Irving Park, Montrose, Harlem, and Cumberland. The project also added accessibility for customers with disabilities at the Addison station with the installation of a new elevator.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Division-Street-Entrance-Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Chicago-Ave.-Entrance-Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Grand-Street-Entrance-Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Mezzanine-Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Platform-Rendering.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Chicago Transit Authority","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Blue-Line-Subway-Renovation-Chicago-Ave.-Entrance-Rendering-672x372.jpg"},{"project_ID":8458,"project_name":"Bridge 47C Reconstruction","project_location":"Dixmoor, IL","project_region":"Chicago","project_description":"The reconstruction of the 47C bridge, Indiana Harbor Belt Railroad needed to upgrade and replace the three independent, wooden railroad bridges over Thornton Road in Dixmoor. Construction was performed in phases to keep train traffic open at all times. The new structure kept the existing elevation to match the track on both sides.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Bridge-47C-Reconstruction-Structural-Steel.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Bridge-47C-Reconstruction-Aerial-Font-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Bridge-47C-Reconstruction-Caissons.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Bridge-47C-Reconstruction-Aerial.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Bridge-47C-Reconstruction-Tracks.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Unit Price","project_award":"","project_client":"Indiana Harbor Belt Railroad","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Bridge-47C-Reconstruction-Tracks-672x372.jpg"},{"project_ID":8402,"project_name":"Bridges Program Renovations","project_location":"Lincolnwood, IL","project_region":"Chicago","project_description":"The interior renovation of an existing one-story, 50,000 SF warehouse and built out spaces such as a gym, apartment lab, caf\u00e9 lab, offices, and more. The Bridges Program in Niles Township High School District 219 provides post-high school training to adult graduates with special needs.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Niles-Bridges-6-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Niles-Bridges-5-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Niles-Bridges-4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Niles-Bridges-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Niles-Bridges-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Niles-Bridges-1-scaled.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Niles Township High School District 219","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Niles-Bridges-1-672x372.jpg"},{"project_ID":8473,"project_name":"Burley Avenue & 122nd Street Roadway Improvements","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The roadway improvements of Burley Avenue and 122nd Street. The project consisted of site work that included installing storm sewers, excavation, installing asphalt paving, and landscaping.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/burley-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/burley-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/burley-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/burley-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"NorthPoint Development","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/burley-4-672x372.jpg"},{"project_ID":8407,"project_name":"Byrne Elementary School Annex","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a 35,000 SF two-story addition to the existing elementary school. Additions included classrooms, a new library, and a warming kitchen. F.H. Paschen also renovated existing classrooms in the original building, renovated the existing parking lot, and built a new turf field.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Exterior-Front-Far.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Exterior-Front.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Exterior-Pano.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Exterior-Back.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Exterior-Side-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Exterior-Field-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Interior-Cafeteria.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Interior-Classroom.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Interior-Hallway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Interior-Science-Lab.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Interior-Library.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Public Building Commission","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Byrne-Elementary-School-Annex-Exterior-Front-Far-1-672x372.jpg"},{"project_ID":8514,"project_name":"Calument Primary Settling Tanks","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The major facility upgrades at the Calumet Water Reclamation Plant. Phase one included preliminary sewage screening and pumping facilities. Phase two involved construction of a new grit building. The project also included 12, 155-feet diameter primary settling tanks, along with several interconnecting service tunnels, four new tunnel access pump stations, and two 96-inch force mains extending to the grit building.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Settling-Tanks-Aerial.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tank-Building-Exterior.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Interior-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tank-Interior.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Aerated-Grit-Tank-Empty.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Aerated-Grit-Tank-Full.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Grit.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tank-Settling-Tank-Close.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Settling-Tank.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tank-Pipe.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Aerial-Before-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Aerial-After-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Aerial-Before.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Primary-Settling-Tanks-Aerial-After.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Metropolitan Water Reclamation District of Chicago","project_sector":["Heavy Civil","Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Calumet-Settling-Tanks-Aerial-672x372.jpg"},{"project_ID":8518,"project_name":"Camp Atterbury ORTC Company Headquarters","project_location":"Edinburgh, IN","project_region":"Great Lakes","project_description":"The construction of a new 8,900 SF headquarters for the New Indiana National Guard ORTC. The project consisted of a masonry block with brick veneer, shingled roof, to house new offices, storage, and restroom facilities.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/camp-atterbury-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/camp-atterbury-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/camp-atterbury-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"State of Indiana","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/camp-atterbury-3-672x372.jpg"},{"project_ID":8422,"project_name":"CATH I.R Labs Remodel","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The three-phased renovation of an occupied Interventional Radiology Suite and Cardiac Cath Lab at the University of Illinois Chicago, which included complete demolition of existing room finishes, and infrastructure upgrades to mechanical and electrical services servicing equipment to each room.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CATH-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CATH-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CATH-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CATH-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois - Chicago","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CATH-1-672x372.jpg"},{"project_ID":8435,"project_name":"CCD Operating Room Activation","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The activation of another operating room for the University of Chicago Medicine. Work included activating and installing the infrastructure for the room, including surgical boom support, a surgical sink, and light retrofit.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CCDOperatingRoom01.png?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CCDOperatingRoom02.png?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Chicago Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CCDOperatingRoom02-672x372.png"},{"project_ID":8512,"project_name":"Central Business District","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The design-build of a 17,888 sf facility that serves as a fleet repair garage, wash bay, and warehouse. The facility also includes administrative offices, open office areas, caf\u00e9 & kitchen areas, locker rooms, and a fitness room.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-business-district-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-business-district-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-business-district-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-business-district-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-business-district-5.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Private Client","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-business-district-2-672x372.jpg"},{"project_ID":8375,"project_name":"Central Deicing Facility Ramp Tower","project_location":"Chicago, IL","project_region":"Chicago","project_description":"This award-winning project included the construction of a four-story, 7,500 SF deicing facility that houses communication equipment and personnel at O\u2019Hare International Airport. The facility is a steel structure with composite panels, extensive communication systems, UPS, and grounding.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Deicing-Facility-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Deicing-Facility-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Deicing-Facility-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Deicing-Facility-4.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2019: Chicago Department of Aviation (IRTBA) - Contractor of the Year","project_client":"Chicago Department of Aviation","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Deicing-Facility-4-672x372.jpg"},{"project_ID":8521,"project_name":"Central Maintenance Facility Salt Storage Dome","project_location":"Fairfax, VA","project_region":"Mid-Atlantic","project_description":"The construction of a Central Maintenance Facility (CMF) Salt Storage. The project consisted of a 90\u2019 diameter dome, 10,000 gallons underground storage tank, stationary conveyor, rain garden and storm system, and associated plumbing and electrical components.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Maintenance-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Maintenance-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Maintenance-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Maintenance-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"2021 County of Fairfax \u2013 Award of Excellence fir Building Design & Construction","project_client":"Fairfax County Department of Public Works & Environmental Services","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Central-Maintenance-1-672x372.jpg"},{"project_ID":8509,"project_name":"Central Shop Field Service Center","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The design-build of a 75,560 SF building. The building houses fleet repair bays, training rooms, offices, fitness room, locker rooms, and a material storage warehouse. The service center is home to approximately 400 full-time employees and will operate nonstop.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-shop-field-center-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-shop-field-center-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-shop-field-center-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-shop-field-center-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-shop-field-center-5.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Private Client","project_sector":[],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/central-shop-field-center-1-672x372.jpg"},{"project_ID":8452,"project_name":"Chicago Bee Library","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The exterior and interior renovations to the Chicago Bee Branch Library, which is a Landmark building in the city of Chicago. Exterior renovations included terra cotta, refurbishment of historical windows, fencing installation, and parking lot asphalt repairs. Interior renovations included full power and data upgrades, new carpet and tile, new building automation system, new fire alarm system, new access control system, and bathroom renovations.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Bee-Library-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Bee-Library-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Bee-Library-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Bee-Library-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Job Order Contracting","project_award":"Commission on Chicago Landmarks \u2013 Chicago Landmark Award for Preservation Excellence \u2013 Rehabilitation\u00a0","project_client":"Chicago Department of Assest, Information and Services (AIS)","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Bee-Library-1-672x372.jpg"},{"project_ID":8483,"project_name":"Chicago Riverwalk Esplanade Improvements & Marketplace","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The improvements of the Chicago River Riverwalk. Work included replacing and widening the Riverwalk path, adding new vendor spaces for Minority and Women Owned Businesses, and placing an additional 75,000 SF of new landscape.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Tour-Boats.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Under-Bridge.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Aerial-Drone-East-Facing.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Riverwalk-Long-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Aerial-Drone-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Aerial-Drone-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Aerial-Drone-West-Facing.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Staircase.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Riverwalk-Overhead.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Long-Landscape-with-Pedestrians.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Landscaping-with-Navy-Pier.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Aerial-Drone-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Landscaping-with-Walker.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Landscaping-with-Jogger.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Indoor-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Chicago-Riverwalk-Esplanade-Improvements-and-Marketplace-Aerial-Drone-1.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Job Order Contracting","project_award":"2020: Chicago Building Congress \u2013 Award of Merit Finalist \u2013 Renovations & Adaptive Reuse Under $15M\r\n2020: ENR Midwest \u2013 Best Small Project \r\n2020: CISCO \u2013 Project of the Year \u2013 Rehabilitation ","project_client":"Chicago Department of General Services","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/07\/1706-18_DSC0459-scaled-672x372.jpg"},{"project_ID":8419,"project_name":"Chicago Waldorf School Building Renovation","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The fast-track, ten-week renovation of an existing and vacant school building for the Chicago Waldorf School. Renovations consisted of interior upgrades and renovations, including new ADA bathrooms, new water fountains, flooring and painting in the classrooms and administrative offices, new classroom layouts, and a new gymnasium floor.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/waldorf-building-renovation-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/waldorf-building-renovation-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/waldorf-building-renovation-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/waldorf-building-renovation-4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/waldorf-building-renovation-5-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"The Chicago Waldorf School","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/waldorf-building-renovation-1-672x372.jpg"},{"project_ID":8494,"project_name":"Cinespace Streetscape Project","project_location":"Chicago, IL","project_region":"Chicago","project_description":"","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/cinespace-streetscape-project-1.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/cinespace-streetscape-project-2.jpeg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Cinespace Chicago Film Studios","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/cinespace-streetscape-project-1-672x372.jpeg"},{"project_ID":8387,"project_name":"Clinical Performance Center","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The partial build-out of the fourth floor and a full build-out of the fifth floor of the Mile Square Health Center building to provide a clinical instructional simulation center. The project includes lobbies and reception, 22 standardized patient clinical exam rooms, an emergency room, inpatient, outpatient, and operating room simulation suites, control rooms, a procedural skills lab; conference\/debriefing rooms, and computer\/learning lab classrooms.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-4-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-5-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-6-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-7-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-8-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-9-scaled.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois - Chicago","project_sector":["Education","Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/Clinical-Performance-1-scaled-672x372.jpg"},{"project_ID":8484,"project_name":"Community Arts Center Interior Renovation","project_location":"Buffalo Grove, IL","project_region":"Chicago","project_description":"The interior renovation of the Grove Community Arts Center. Work included renovation of the lobby, vestibule, multipurpose room, and 360-seat theatre. The expanded space meets the community\u2019s increasing demand for more performing arts classes and opportunities, event and training space, and Park District programs.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Theater-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Theater-Backstage.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Theater-Seating.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Theater-Stage.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Theater-Aisle.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Private-Room.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Performance-Space.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Performance-Space-with-Partition.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Lobby.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Art-Wall.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Art-Wall-Far.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"2020: Illinois Park & Recreation Association \u2013 Outstanding Facility Award\u00a0","project_client":"Buffalo Grove Park District","project_sector":["Municipal","Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Buffalo-Grove-Community-Arts-Center-Entrance-672x372.jpg"},{"project_ID":8485,"project_name":"Community Recreation Center Renovation","project_location":"Schaumburg, IL","project_region":"Chicago","project_description":"The renovation to Schaumburg\u2019s Community Recreation Center included all new finishes in the bathrooms, recreation rooms, and office spaces, as well as new structural staircases and glazed decorative metal handrails, and new automatic sliding doors at the entry and interior storefront.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-2nd-Floor.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Childrens-Play-Room-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Childrens-Play-Room-Storage.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Childrens-Play-Room.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Lobby-2nd-Floor-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Lobby.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Lounge.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Multi-Purpose-Room.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Track-and-Equipment.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Schaumburg-Park-District-CRC-Renovation-Track.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"2020: Association of Licensed Architects \u2013 Award of Merit","project_client":"Schaumburg Park District","project_sector":["Municipal","Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/07\/1706-12Img19712-scaled-672x372.jpg"},{"project_ID":8355,"project_name":"Concourse L “Stinger”","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of a new 49,540 SF concourse at O\u2019Hare International Airport (ORD). The concourse is capable of handling five regional aircraft, with a pedestrian bridge which connects to Terminal 3.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Concourse-L-Stinger-Exterior-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Concourse-L-Stinger-Concourse-Hallway-Pano.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Concourse-L-Stinger-Concourse-Hallway.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Concourse-L-Stinger-Gate-Hallway-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Concourse-L-Stinger-Gate-Seating-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Concourse-L-Stinger-Boarding-Bridge-1.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"CM@Risk","project_award":"2019: Construction Management Association of America \u2013 Chicago Chapter Achievement Award \r\n2018: ENR \u2013 Award of Merit, Airports \/ Transit Sector ","project_client":"American Airlines ","project_sector":["Aviation","Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/American-Airlines-Concourse-L-Stinger-Exterior-1-672x372.jpg"},{"project_ID":8443,"project_name":"Engine Co. 16","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new 19,725 SF firehouse, constructed to Public Building Commission prototype \u2018B\u2019 design, includes an apparatus bay, emergency vehicle and HazMat equipment storage, kitchen and dining area, locker rooms, sleeping quarters, officer\u2019s quarters, a training room, a meeting room, a radio room, and EMS Field Division offices.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Engine-Co.-32-Street-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Engine-Co.-16-Vehicle-Bays.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Engine-Co.-16-Vehicle-Bays-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Engine-Co.-16-Street-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Engine-Co.-16-Kitchen.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Engine-Co.-16-Control-Center.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Engine-Co.-16-Administrative-Desk.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"2013: ENR Midwest \u2013 Award of Merit \u2013 Government\/Public Buildings\u00a0","project_client":"Public Building Commission","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Engine-Co.-16-Vehicle-Bays-Night-672x372.jpg"},{"project_ID":8497,"project_name":"Escalator Canopies","project_location":"Washington, DC","project_region":"Mid-Atlantic","project_description":"The construction of 10 canopies at Metro Station entrances in different parts of D.C., Virginia, and Maryland.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/WMATA-Escalator-Canopies-Elevated-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/WMATA-Escalator-Canopies-Distance-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/WMATA-Escalator-Canopies-Back-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/WMATA-Escalator-Canopies-Top-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/WMATA-Escalator-Canopies-Side-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/WMATA-Escalator-Canopies-Inside-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/WMATA-Escalator-Canopies-Front-View.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Washington Metropolitan Area Transit Authority","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/WMATA-Escalator-Canopies-Front-View-672x372.jpg"},{"project_ID":8357,"project_name":"Ground Equipment Maintenance Facility","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of a new Ground Equipment Maintenance (GEM) building for American Airlines at O\u2019Hare International Airport (ORD). The new facility features storage of ground equipment, 30 maintenance work bays, vehicle fluids distribution system, a vehicle wash facility, and 20,000 SF of employee workspace.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-American-Airlines-GEM-Facility-Building-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-American-Airlines-GEM-Facility-Exterior-Close-Up-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-American-Airlines-GEM-Facility-Service-Shop-Close-Up-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-American-Airlines-GEM-Facility-Service-Shop-Interior-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-American-Airlines-GEM-Facility-Storage-Area-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-American-Airlines-GEM-Facility-Office-Space-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-American-Airlines-GEM-Facility-Rear-Exterior-1.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"American Airlines","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Airport-American-Airlines-GEM-Facility-Building-1-672x372.jpg"},{"project_ID":8461,"project_name":"Halsted Street Bridge – W3.34 Replacement","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The removal and replacement of three railroad bridges over Halsted St. Columns underneath the bridges were replaced first, followed by the removal and replacement of the bridge structures.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/IMG_2112-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"CN Railroad","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/IMG_2112-672x372.jpg"},{"project_ID":8358,"project_name":"Hold Room Configuration","project_location":"Arlington, VA","project_region":"Mid-Atlantic","project_description":"The renovation and reconfiguration of four gates and 11 podiums for United Airlines in Ronald Reagan Washington National Airport (DCA). Work was completed one gate at a time and typically during off-hours to minimize disruptions to travelers and United Airlines.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/United-Airlines-Hold-Rooms-Customer-Service-Counter-Close-Up-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/United-Airlines-Hold-Rooms-Customer-Service-Counters-Behind-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/United-Airlines-Hold-Rooms-Customer-Service-Counter-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/United-Airlines-Hold-Rooms-Gate-Counters-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/United-Airlines-Hold-Rooms-Gate-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/United-Airlines-Hold-Rooms-Gate-Counters-Behind-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/United-Airlines-Hold-Rooms-Ticket-Kiosks-2.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"United Airlines","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/United-Airlines-Hold-Rooms-Customer-Service-Counters-Behind-2-672x372.jpg"},{"project_ID":8486,"project_name":"Hubbard Woods Pavilion","project_location":"Winnetka, IL","project_region":"Chicago","project_description":"The construction of a park pavilion structure to serve as the stage area for summer concerts and to house public restrooms for the new park. Work included the demolition of an existing structure, and construction of the new one-story pavilion.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Pavillion-Structure.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Pavillion-Structure-Side-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Playground-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Pavillion-Structure-and-Park.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Park.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Playground-and-Pavillion-Structure.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Playground.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Park-Sign.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"2017: American Society of Landscape Architects \u2013 General Design-Constructed Project\u00a0","project_client":"Winnetka Park District","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Hubbard-Woods-Pavillion-Pavillion-Structure-672x372.jpg"},{"project_ID":8469,"project_name":"I-290 \/ Elgin O’Hare Flyover Bridge","project_location":"Itasca, IL","project_region":"Chicago","project_description":"The construction of the 2,100 FT long bridge that was built over the existing I-290. The flyover ramp bridge was built in three segments and included eight concrete piers with 6 to 8-ft. diameter columns and 54 steel girders to support the new ramps. The bridge\u2019s deck is 49-ft wide (two lanes and wide shoulders on each side) and is 34-ft. above grade at its highest point.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge-Aerial-Long-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge-Street-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge-Street-Under-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge-Street-Under-View-Long.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge-Embankment.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge-Embankment-Oncoming-Traffic.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge-Embankment-Long-View.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Illinois State Toll Highway Authority","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-290-Elgin-OHare-Flyover-Bridge-Aerial-Long-View-672x372.jpg"},{"project_ID":8470,"project_name":"I-90 Widening & Reconstruction","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The reconstruction of multiple bridges and large cut and cover tunnel drainage structures as well as high-performance concrete pavements designed to be in service for as much as 35 years.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Aerial.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Concrete-Pour-Back-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Concrete-Pour-Close-Up.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Concrete-Pour-Prep.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Concrete-Pour.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Concrete-Prep.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Concrete-Finishing.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Operator.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Illinois State Toll Highway Authority","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/I-90-Widening-Reconstruction-IL-53-to-Arlington-Heights-Road-Arlington-Heights-Road-to-Oakton-Aerial-672x372.jpg"},{"project_ID":8468,"project_name":"Lakefront Trail & Navy Pier Flyover Improvement","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of part of the Lakefront Trail, an elevated walkway that spans over Illinois Street and Grand Avenue at the intersection of Lake Shore Drive. 0.31 miles were constructed, and the work consisted of a new superstructure for pedestrian and bicycle traffic use.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Street-View-Night-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Street-View-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Trail-Stairs.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Trail-View-with-Lake-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Trail-View-with-Lake.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Trail-View-with-LSD.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Under-View-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Under-View-with-Ferris-Wheel.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-View-from-Sidewalk.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2021: ENR Midwest \u2013 Award of Merit \u2013 Highway\/Bridge\u00a0","project_client":"Chicago Department of Transportation","project_sector":["Heavy Civil","Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Lakefront-Trail-Navy-Pier-Flyover-Improvement-Street-View-Night-1-672x372.jpg"},{"project_ID":8487,"project_name":"Long Bridge Park Playground Areas","project_location":"Arlington, VA","project_region":"Mid-Atlantic","project_description":"The construction services for playground areas at Long Bridge Park in Arlington, Virginia. Work included the provision and installation of site storm utilities, concrete sidewalks, playground equipment, high pressure fog system, playground surfacing, and custom site furnishings.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Rails.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Slide.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Top-of-Slide.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Tunnel.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Fog-Poles.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Fog-Poles-Close-Up.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Fog-.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-Fog-Close-Up.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Obstacle-Course.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Arlington County","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Long-Bridge-Park-Playground-Park-672x372.jpg"},{"project_ID":8394,"project_name":"Memorial Union Biddle Hotel Guest Rooms Renovation","project_location":"Bloomington, IN","project_region":"Great Lakes","project_description":"The renovation for Indiana University involved renovating 61,000 SF which included 160 hotel rooms, corridors, and elevator lobbies on four floors.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Indiana-Memorial-Union-Biddle-Hotel-Guest-Rooms-Renovation-Rendering-2.png?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Indiana-Memorial-Union-Biddle-Hotel-Guest-Rooms-Renovation-Bathroom-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Indiana-Memorial-Union-Biddle-Hotel-Guest-Rooms-Renovation-Bedroom-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Indiana-Memorial-Union-Biddle-Hotel-Guest-Rooms-Renovation-Living-Room-1.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Job Order Contracting","project_award":"","project_client":"Indiana University","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Indiana-Memorial-Union-Biddle-Hotel-Guest-Rooms-Renovation-Rendering-2-672x372.png"},{"project_ID":8489,"project_name":"Museum Park Baywalk & Promenade Phase 2 & 3","project_location":"Miami, FL","project_region":"Southeast","project_description":"The multi-phased construction of a park in Miami, Florida. F.H. Paschen took part in the second and third phase of the project which included site work, lighting, walkways and ramps, site furnishings landscaping, and promenade walkway irrigation.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Museum-Baywalk-Promenade-Aerial.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Museum-Baywalk-Promenade-Aerial-Before.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Museum-Baywalk-Promenade-Walking-Path.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Museum-Baywalk-Promenade-Ocean-Front.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"City of Miami","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Museum-Baywalk-Promenade-Aerial-672x372.jpg"},{"project_ID":8482,"project_name":"New Headquarters and Campus","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of new 58,000 SF headquarters for the Chicago Park District. The new Park District campus will feature 14 acres of green space, a new 20,000 SF field house, playground, athletic fields, water features, among many other amenities. This project is a joint-venture with ALL Construction Group. Architect: John Ronan Architects (Renderings)","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Rendering-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Rendering.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Rendering-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Rendering-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Rendering-6.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Park District","project_sector":["Municipal","Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Rendering-3-672x372.jpg"},{"project_ID":8353,"project_name":"O’Hare 21 Program","project_location":"Chicago, IL","project_region":"Midwest","project_description":"A historic plan made by the City of Chicago and its airline partners that will transform O\u2019Hare International Airport (ORD) with the biggest terminal expansion ever is underway. The upgrades are set to grow ORD\u2019s overall terminal square footage by more than 60% and increase gate frontage by 25%. More information can be found at www.tpapord.com.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/04\/OHare21-Render.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/04\/OHare21-Render-Terminal-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/04\/OHare21-Development-Arial-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/04\/OHare21-Construction.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/04\/OHare21-Terminal-Photo.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation","Heavy Civil","Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/04\/OHare21-Render-672x372.jpg"},{"project_ID":8356,"project_name":"Passenger Checkpoint Expansion","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The 80,000 SF expansion of the pedestrian bridge at Midway International Airport (MDW). The construction was completed without disrupting airport operations or daily vehicular traffic over Cicero Avenue, which remained open through the duration of the project.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Midway-Airport-New-Concourse20200922_0022-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Midway-Airport-New-Concourse20200922_0008-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Midway-Airport-New-Concourse20200922_0021-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/364A9459-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/364A9689-scaled.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2022: American Council of Engineering Companies of Illinois \u2013 Engineering Excellence Honor Award \r\n2021: Construction Industry Service Corporation (CISCO) - 2021 Project of the Year Award Program \r\n2021: AIA Chicago \u2013 Interior Architecture Award \r\n2021: AIA Chicago \u2013 Divine Detail Award \r\n2021: AIA Chicago \u2013 Distinguished Building Award \r\n2021: National Terrazzo & Mosaic Association \u2013 2021 Honor Award \r\n2021: Chicago Building Congress \u2013 Award of Merit, Infrastructure \r\n2019: Constructech \u2013 Vision Awards \u2013 Project of the Year","project_client":"Chicago Department of Aviation","project_sector":["Aviation","Healthcare","Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Midway-Airport-New-Concourse20200922_0022-672x372.jpg"},{"project_ID":8490,"project_name":"Ping Tom Park Boat House","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a one-story 2,458 SF kayak and canoe storage and vending facility. Part of the facility is an enclosed storage area with ornamental fencing for kayaks and canoes. The other section of the building houses restrooms, an office, and a janitor\u2019s closet. The exterior plaza space consists of a metal canopy and a walk to a floating dock.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-Side-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-with-City.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-with-City-Nighttime.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-Boats.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-Boat-Door.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-Aerial.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-Nighttime.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-Daytime.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"2014 AIA Chicago \u2013 2014 Small Projects Honor Award\u00a0","project_client":"Chicago Park District","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Ping-Tom-Memorial-Park-Boathouse-Boathouse-Side-View-672x372.jpg"},{"project_ID":8446,"project_name":"Police Department Renovation","project_location":"Park Ridge, IL","project_region":"Chicago","project_description":"The design-build project included abatement in the ceiling and floor, gutting and renovating the women's locker room, police roll call area, break room, and report-writing areas inside the Park Ridge Police Department, which is in the basement of City Hall. Work was completed while the department remained fully operational.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Police-Light.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Adminstrative-Area.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Conference-Room.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Conference-Room-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Training-Area.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Training-Area-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Break-Room.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Charging-Stations.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Locker-Room.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Wall-of-Recognition.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Police-Badge.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Police Department Renovation","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Park-Ridge-Police-Department-Remodel-Police-Light-672x372.jpg"},{"project_ID":8444,"project_name":"Public Works Facility Renovations","project_location":"River Grove, IL","project_region":"Chicago","project_description":"The renovation of an existing warehouse space into a new public works facility inclusive of new offices, washrooms, locker rooms, mechanics garage, and interior storage and workshop facilities, in addition to all associated mechanical, plumbing, and electrical upgrades.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/River-Grove-Public-Works-Facility-Renovation-Exterior.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/River-Grove-Public-Works-Facility-Renovation-Office.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/River-Grove-Public-Works-Facility-Renovation-Garage.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/River-Grove-Public-Works-Facility-Renovation-Garage-Entrance.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Village of River Grove","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/River-Grove-Public-Works-Facility-Renovation-Exterior-672x372.jpg"},{"project_ID":8457,"project_name":"Railroad Over Cottage Grove Ave.","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The rehabilitation of a portion of the Norfolk Southern Railroad Bridge over South Cottage Grove Avenue just south of 71st Street in Chicago. Work was coordinated with other Chicago Department of Transportation projects being performed in the area so as not to conflict with traffic patterns.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/71st.-St.-Underpass-Rehab-New-Steel.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/71st.-St.-Underpass-Rehab-Old-and-New-Columns.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/71st.-St.-Underpass-Rehab-Old-Steel.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/71st.-St.-Underpass-Rehab-Steel-Replacement.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/71st.-St.-Underpass-Rehab-Under-Bridge.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/71st.-St.-Underpass-Rehab-Under-Bridge-2.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Unit Price","project_award":"","project_client":"Norfolk Southern Corporation","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/71st.-St.-Underpass-Rehab-New-Steel-672x372.jpg"},{"project_ID":8359,"project_name":"Runway 9C-27, Bid Packages 1 & 2","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The construction of the west and center segments of Runway 9C \u2013 27C for the $6.6B O\u2019Hare Modernization Program. This runway was constructed in several phases to maintain aircraft traffic movements and critical Aircraft Rescue and Recovery routes during this project. ","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2020\/12\/11-7-2020-OHare-9C-27C-Runway-Brian-Fritz-Photography-38.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2020\/12\/11-7-2020-OHare-9C-27C-Runway-Brian-Fritz-Photography-57.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/1_3972_FinalFOD.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Runway-9C-27C-Bid-Package-1-GRE.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/OHare-Runway-9C-27C-Bid-Package-1-Aerial-2.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2021: March of Dimes \u2013 Transportation Award \r\n2021: Aviation Pros \u2013 Airport Business Project of the Year \r\n2020: Chicago Department of Aviation (IRTBA) - Contractor of the Year","project_client":"Chicago Department of Aviation","project_sector":["Aviation","Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2020\/12\/11-7-2020-OHare-9C-27C-Runway-Brian-Fritz-Photography-57-672x372.jpg"},{"project_ID":8491,"project_name":"Sherwood Recreation Center Play Area","project_location":"Washington, DC","project_region":"Mid-Atlantic","project_description":"The construction of a recreation center in Washington, D.C. The center was built to accommodate the recreational interest of the community and Goding Elementary School. Work included a new playground and play spaces with educational features, landscaping and irrigation, and the refinishing of existing parking lots.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Sherwood-Recreation-Center-Play-Area-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Sherwood-Recreation-Center-Play-Area-Ladder-and-Slide.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Sherwood-Recreation-Center-Play-Area-Play-Equipment.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Sherwood-Recreation-Center-Play-Area-Bridge.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Sherwood-Recreation-Center-Play-Area-Little-Slide.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Sherwood-Recreation-Center-Play-Area-Entire-Playground.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Sherwood-Recreation-Center-Play-Area-Basketball-Court.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"DC Department of General Services","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Sherwood-Recreation-Center-Play-Area-Ladder-and-Slide-672x372.jpg"},{"project_ID":8388,"project_name":"Simulation Laboratory for College of Nursing","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The pre-construction and construction services to build a 14,000 SF simulation laboratory for the University of Illinois \u2013 Chicago School of Nursing. The new space provides nursing students with simulated clinical, hospital, and home care settings alongside three main instructional spaces.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/UIC-School-of-Nursing20190822_0001-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/UIC-School-of-Nursing20190822_0005-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/UIC-School-of-Nursing20190822_0006-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/UIC-School-of-Nursing20190822_0007-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/UIC-School-of-Nursing20190822_0013-scaled.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois - Chicago","project_sector":["Education","Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/UIC-School-of-Nursing20190822_0001-672x372.jpg"},{"project_ID":8516,"project_name":"Stop Logs & Diversion Pumps at Wilmette Pump Station & Evanston Pump Station Rehab","project_location":"Willmette, IL","project_region":"Chicago","project_description":"The rehabilitation of the Wilmette and Evanston Pump Station. The first phase isolated the existing pump station, phase two included the installation of cofferdams around the Diversion Channel, dewatered the site, replaced old concrete, and removed the existing roller gate structure. Phase three of the project, F.H. Paschen installed a permanent steel sheet pile wall and removed and replaced an existing concrete retaining wall.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Finished.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Station.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Interior.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Controls.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Progress-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Progress-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Progress-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Progress.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Metropolitan Water Reclametion District of Chicago","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Stop-Logs-and-Diversion-Pumps-at-Wilmette-and-Evanston-Pump-Stations-Rehabilitation-Finished-672x372.jpg"},{"project_ID":8445,"project_name":"Sulzer Library","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The 10-phase interior renovation across three floors at Sulzer Library. Work included new flooring and painting throughout the building, a new circulation desk around second floor atrium, new conference rooms, upgraded power and data, bathroom renovations, a new building automation system, a new AV system in the auditorium, and children\u2019s area upgrades.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Sulzer-Library-Computer-Center.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Sulzer-Library-Main-Floor.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Sulzer-Library-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/06\/2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/06\/4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Sulzer-Library-Kids-Area.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/06\/Outside-Shot-of-Sulzer-93.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Assest, Information and Services (AIS)","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2018\/11\/Sulzer-Library-Computer-Center-672x372.jpg"},{"project_ID":8492,"project_name":"Tennis Plus & Bock Center Renovation","project_location":"Schaumburg, IL","project_region":"Chicago","project_description":"The renovation of The Schaumburg Park District facilities, this 4,000 SF project included the renovation of the Tennis Plus Facility and the Bock Neighborhood Center.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Bock-Center-and-Schaumburg-Tennis-Plus-Remodel-Lounge.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Bock-Center-and-Schaumburg-Tennis-Plus-Remodel-Entrance.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Bock-Center-and-Schaumburg-Tennis-Plus-Remodel-Bock-Center.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Bock-Center-and-Schaumburg-Tennis-Plus-Remodel-Bock-Center-Classroom.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Bock-Center-and-Schaumburg-Tennis-Plus-Remodel-Tennis-Plus-Hallway.jpeg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Schaumburg Park District","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Bock-Center-and-Schaumburg-Tennis-Plus-Remodel-Lounge-672x372.jpeg"},{"project_ID":8515,"project_name":"Thornton Quarry","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a 208\u2019 wide by 116\u2019 tall roller compacted concrete gap dam, designed to prevent flooding at Thornton Quarry. Construction included reinforced concrete quarry plugs within the level two and level three haul tunnels that extend through the rock dam at elevation.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-Aerial-Crane-and-Wall.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-Excavator-Far.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-Excavator-Close.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-Aerial-Crane.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-Wall-Pouring.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-Wall-Below.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-North-Wall.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-Aerial.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2016: American Public Works Association \u2013 APWA's Project of the Year, Environment more than $75M \r\n2016: American Public Works Association \u2013 National Nomination \u2013 Project of the Year, Environment more than $75M ","project_client":"Metropolitan Water Reclamation District of Chicago","project_sector":["Heavy Civil","Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Thornton-Quarry-Aerial-Crane-and-Wall-672x372.jpg"},{"project_ID":8460,"project_name":"Union Pacific Railroad – Irving Park Road","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new railroad over a roadway grade separation structure for the re-aligned Union Pacific Railroad over Irving Park Road. Work included demolition, earth excavation and site work.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Aerial.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Aerial-Overhead.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Front-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-On-Tracks.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-On-Tracks-Far-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Securing-Girder.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Steel-Erection.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Steel-Placemenet.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Structural-Steel.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Underpassing-Traffic.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Tracks-and-Plane.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2014: Chicago Department of Aviation \u2013 Green Airplane Certification","project_client":"Union Pacific Railroad - Irving Park Road","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/10\/Union-Pacific-Railroad-Irving-Park-Road-Aerial-672x372.jpg"},{"project_ID":8393,"project_name":"University Fa\u00e7ade Repair","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The restoration of UIC\u2019s University Hall building fa\u00e7ade. This project included the pouring of over 200 cubic yards of concrete to repair its columns and spandrels.\u202fThe 28-story brutalist style building is the tallest building on Chicago's West Side.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UIC-Facade-Side.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UIC-Facade-Close.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UIC-Facade-Front.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UIC-Facade-Front-Distance.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois - Chicago","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/UIC-Facade-Side-667x372.jpg"},{"project_ID":8391,"project_name":"Vet Teaching Hospital LINAC Addition","project_location":"Urbana, IL","project_region":"Chicago","project_description":"The construction of a 1,500 SF addition to the Veterinary Medicine Teaching Hospital to house a linear accelerator vault. This project also consisted of additional remodeling of 1,200 SF of support space on the lower level of the existing building including the control room, mechanical equipment room, a treatment planning area, holding and prep\/recovery space, and offices. ","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/med_thumb_RackMultipart20190520-26724-7qyvo1.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/med_thumb_RackMultipart20190520-25138-18zjr3j.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/med_thumb_RackMultipart20190723-3079-cmk1pm.jpeg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois - Urbana","project_sector":["Education","Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2021\/06\/med_thumb_RackMultipart20190520-26724-7qyvo1-650x372.jpeg"},{"project_ID":8471,"project_name":"Wacker Drive Reconstruction Congress Parkway Interchange Improvements","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new gateway entrance to the city from the west. Work began with the demolition of existing interchange roadways and Lower Wacker Drive tunnels. Rehabilitation involved extensive foundation work, deck and beam replacement along Congress Parkway. New tunnels from lower Wacker Drive to westbound Congress Parkway and from eastbound Congress Parkway to Wacker Drive\/Franklin Street were also included. Wells Street was widened, and Van Buren Street was resurfaced between Wells Street and Wacker Drive.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Wacker-Drive-Reconstruction-Aerial.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Wacker-Drive-Reconstruction-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Wacker-Drive-Reconstruction-Entrance-Under-Construction.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Wacker-Drive-Reconstruction-Finished-Entrance.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Wacker-Drive-Reconstruction-Tunnel.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Wacker-Drive-Reconstruction-Breakthrough.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Wacker-Drive-Reconstruction-Breakthrough-Team.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2014: American Council of Engineering - Grand Conceptor Award \r\n2013: Chicago Building Congress \u2013 Merit Award Finalist \r\n2013: ENR Midwest \u2013 ENR Midwest\u2019s Best Project \u2013 Highways\/Bridges \r\n2012: Chicago Department of Transportation (IRTBA) - Outstanding Contractor of the Year","project_client":"Chicago Department of Transportation","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Wacker-Drive-Reconstruction-Aerial-672x372.jpg"},{"project_ID":8466,"project_name":"Western Avenue Viaduct Over Belmont Avenue","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The demolition of the Western Avenue viaduct over Belmont Avenue. F.H. Paschen also completed the reconstruction of Western Avenue between the Chicago River bridge and W. Roscoe Street, the resurfacing of a portion of Western Avenue and the reconstruction of the Western Avenue bridge over the Chicago River.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Western-Avenue-Viaduct-Over-Belmont-Ave-Pre-Demolition.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Western-Avenue-Viaduct-Over-Belmont-Ave-Under-Bridge-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Western-Avenue-Viaduct-Over-Belmont-Ave-Start-of-Demolition.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Western-Avenue-Viaduct-Over-Belmont-Ave-Deck-Demolition.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Western-Avenue-Viaduct-Over-Belmont-Ave-Column-Demolition.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Western-Avenue-Viaduct-Over-Belmont-Ave-Action.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Chicago Department of Transportation","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Western-Avenue-Viaduct-Over-Belmont-Ave-Pre-Demolition-672x372.jpg"},{"project_ID":8498,"project_name":"Washington\/Wabash Loop Elevated CTA Station","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new station at Washington\/Wabash servicing the Loop neighborhood along Wabash Avenue\u2019s Jewelers Row district. The Washington\/Wabash Station combined the historic, but dated, Madison\/Wabash & Randolph\/Wabash stations into a single station with 800\u2019 of ADA accessible elevated platform and is next to five continually running CTA Routes.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Canopies-Long-View-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Canopies-Distance-Night.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Trains-in-Station.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Elevated-Long-Shot.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Platforms-Day.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Exterior.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Station-Street-Level.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Station-Street-Level-Mural.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Platforms.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Top-View.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"2018: Association of Subcontractors & Affiliates \u2013 Outstanding Project of the Year \r\n2018: Chicago Building Congress \u2013 Merit Award \u2013 Infrastructure \r\n2018: ACEC \u2013 Engineering Excellence Grand Award \r\n2017: Construction Industry Service Corporation (CISCO) - Finalist \u2013 Project of the Year\r\n2017: Chicago Department of Transportation (IRTBA) - Outstanding Transit Contractor of the Year \r\n2016: Interior Design Magazine \u2013 Best of the Year - \u201cOn the Boards Commercial\u201d Category","project_client":"Chicago Department of Transportation","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2017\/08\/Washington-Wabash-Loop-Elevated-Station-Canopies-Long-View-Night-672x372.jpg"},{"project_ID":8392,"project_name":"West End Building and “Student Street” Renovation","project_location":"Des Plaines, IL","project_region":"Chicago","project_description":"The renovation of the West End Building at Oakton Community College. Renovations stretched across two floors of classrooms and were completed over four phases to allow the building to remain open to students and staff.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Oakton-Community-College-West-End-Building-Renovation-and-Student-Street-Renovation-Lobby.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Oakton-Community-College-West-End-Building-Renovation-and-Student-Street-Renovation-Office.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Oakton-Community-College-West-End-Building-Renovation-and-Student-Street-Renovation-Seating-and-Stairs.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Oakton-Community-College-West-End-Building-Renovation-and-Student-Street-Renovation-Reception.jpeg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Oakton Community College","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/08\/Oakton-Community-College-West-End-Building-Renovation-and-Student-Street-Renovation-Lobby-672x372.jpg"},{"project_ID":8488,"project_name":"Youth Ball Complex","project_location":"Cordele, GA","project_region":"Southeast","project_description":"The 17-acre design-build of three youth baseball fields with dugouts, two soccer fields, a picnic pavilion, two restroom buildings, concession area, a 10-bay batting cage, and a playground. All civil, drainage, irrigation, and building designs were developed jointly with Crisp County officials.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Crisp-County-Youth-Baseball-Complex-Aerial-View.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Crisp-County-Youth-Baseball-Complex-Baseball-Fields-Aerial.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Crisp-County-Youth-Baseball-Complex-Baseball-Fields-and-Playground.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Crisp-County-Youth-Baseball-Complex-Hitting-Stations.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Crisp-County-Youth-Baseball-Complex-Soccer-Fields.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Crisp County Parks & Recreation","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2016\/09\/Crisp-County-Youth-Baseball-Complex-Aerial-View-672x372.jpg"},{"project_ID":8455,"project_name":"Courtroom Renovations","project_location":"Fairfax, VA","project_region":"Mid-Atlantic","project_description":"The renovation of the Fairfax County Courthouse. Renovations included six courtrooms, jury deliberation rooms, attorney-client rooms, audio and visual rooms, bathrooms, and judge\u2019s corridor. Work included the demolition and replacement of existing floor, wall, and ceiling finishes as well as demolition and\/or modifications of existing sprinkler, plumbing, mechanical, electrical and security systems supporting the courtrooms.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Courtroom-Renovations-1.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Courtroom-Renovations-2.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Courtroom-Renovations-3.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Courtroom-Renovations-cover.png?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Fairfax County","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Courtroom-Renovations-cover-672x372.png"},{"project_ID":8426,"project_name":"CT Sim DCAM","project_location":"Chicago, IL","project_region":"Chicago","project_description":"","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CT-sim-DCAM-1.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Chicago Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/CT-sim-DCAM-1-672x372.jpg"},{"project_ID":8378,"project_name":"East Cooling Tower Replacement","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The demolition and replacement of the east cooling tower which serves three chillers at the O\u2019Hare International Airport (ORD) Heating & Refrigeration Plant. Additional work also included new condenser water pumps that serve the new east cooling tower, extensive electrical power work, and extensive controls systems to operate and monitor the system.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/cooling-tower-replacement-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/cooling-tower-replacement-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/cooling-tower-replacement-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/cooling-tower-replacement-4.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/cooling-tower-replacement-4-672x372.jpg"},{"project_ID":8384,"project_name":"Elevated Parking Garage","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a seven-story, 6,377-space parking garage at Midway International Airport (MDW). The parking garage includes a shuttle bus bridge, four stair towers, and two elevators.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elevated-garage-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elevated-garage-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elevated-garage-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elevated-garage-4.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elevated-garage-1-672x372.jpg"},{"project_ID":8476,"project_name":"Elgin O’Hare Western Access Tollway","project_location":"Itasca, IL","project_region":"Chicago","project_description":"The structural excavation, structural concrete, noise abatement wall removal and installation, and retaining wall installation. Work also included the widening of the bridge\/roadway from Irving Park Rd. to Roselle Rd.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elgin-ohare-Zone1-2a.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elgin-ohare-Zone1-2b.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elgin-ohare-Zone1-4b.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elgin-ohare-Zone2-2a.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elgin-ohare-Zone2-2g.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elgin-ohare-Zone2-3a.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Unit Price","project_award":"","project_client":"Illinois State Toll Highway Authority","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/elgin-ohare-Zone2-3a-672x372.jpg"},{"project_ID":8429,"project_name":"Emergency and Triage Remodel","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The remodel of the 7,500 SF front-half of the Emergency Department at the University of Illinois at Chicago Hospital to provide better patient flow. Work included a new waiting, reception, triage, nurse station, treatment areas, check-out and support spaces.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-emergency-triage-remodel-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-emergency-triage-remodel-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-emergency-triage-remodel-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-emergency-triage-remodel-5.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-emergency-triage-remodel-6.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-emergency-triage-remodel-1.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois Health Systems","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-emergency-triage-remodel-5-672x372.jpg"},{"project_ID":8453,"project_name":"Emergency Operations Center","project_location":"Greenwood, IN","project_region":"Great Lakes","project_description":"The construction of a new emergency operations center. This building is one of the first of its kind by hosting three separate agencies to better service the community. It houses the new headquarters for the Center Grove Police Department, a full-service fire station shared by White River Township and Bargersville, and a satellite office for the Johnson County Sheriff's Office.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/center-grove-school-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/center-grove-school-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/center-grove-school-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/center-grove-school-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/center-grove-school-5.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Center Grove School Operation","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/center-grove-school-4-672x372.jpg"},{"project_ID":8417,"project_name":"Emiliano Zapata Annex","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The site remediation and construction of a 5,000 SF two-story annex to the existing Zapata Elementary Academy. Construction included new classrooms, a computer lab, student dining room and server, administrative offices, faculty workroom, restrooms, storage, mechanical, and electrical rooms.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Zapata-Elementary-Annex-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Zapata-Elementary-Annex-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Zapata-Elementary-Annex-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Zapata-Elementary-Annex-4.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Public Building Commission","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Zapata-Elementary-Annex-1-672x372.jpg"},{"project_ID":8418,"project_name":"Esmond Elementary School Annex & Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new, 20,000 SF two-story annex to the existing two-story school. The annex includes standard classrooms, a science lab, a computer lab, an art room with storage, administrative offices, a new dining room and kitchen, bathrooms, and storage areas.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Esmond-Elementary-Renovations-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Esmond-Elementary-Renovations-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Esmond-Elementary-Renovations-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Esmond-Elementary-Renovations-4.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Public Building Commission","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Esmond-Elementary-Renovations-4-672x372.jpg"},{"project_ID":8425,"project_name":"Fluoroscopy Lab Renovation","project_location":"Chicago, IL","project_region":"Chicago","project_description":"","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fluoroscopy-lab-renovations-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fluoroscopy-lab-renovations-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fluoroscopy-lab-renovations-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"University of Chicago Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fluoroscopy-lab-renovations-2-672x372.jpg"},{"project_ID":8427,"project_name":"Health Center Renovation & Replacement","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The interior build-out of an outpatient medical clinic on the ground floor of an existing building that was previously a Sports Authority for the North Riverside Health Center. The new space provides outpatient, x-ray, and dental rooms, nurse stations, bathrooms, conference rooms, lobby\/reception areas, and offices.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/North-Riverside-Health-Center-Renovations-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/North-Riverside-Health-Center-Renovations-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/North-Riverside-Health-Center-Renovations-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/North-Riverside-Health-Center-Renovations-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/North-Riverside-Health-Center-Renovations-5.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Cook County Hospital & Health System","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/North-Riverside-Health-Center-Renovations-1-672x372.jpg"},{"project_ID":8524,"project_name":"Heritage Park Flood Control Facility","project_location":"Wheeling, IL","project_region":"Chicago","project_description":"The construction of a new floodwater containment facility along with a park that includes four baseball fields, a concessions facility, a bandshell for concerts, a pavilion, and four soccer facilities. The flood facility was made up of five separate basins and two pump stations that can hold up to three million gallons of water to hold any overflow from the Des Plaines River.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/heritage-park-flood-control-facility-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/heritage-park-flood-control-facility-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/heritage-park-flood-control-facility-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/heritage-park-flood-control-facility-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/heritage-park-flood-control-facility-5.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Metropolitan Water Reclamation District of Chicago","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/heritage-park-flood-control-facility-5-672x372.jpg"},{"project_ID":8474,"project_name":"I-18-4390 I-294 O’Hare Oasis Bridge Demolition & Grading","project_location":"Schiller Park, IL","project_region":"Chicago","project_description":"The demolition of the O\u2019Hare Oasis building and bridge structure over I-294 to allow for the addition of traffic lanes in the future expansion of the I-294 corridor.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHare-Oasis-Demolition-Grading-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHare-Oasis-Demolition-Grading-2.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Unit Price","project_award":"","project_client":"Illinois State Toll Highway Authority","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHare-Oasis-Demolition-Grading-2-672x372.jpg"},{"project_ID":8397,"project_name":"Innovation Center & Entry Renovations","project_location":"Carol Stream, IL","project_region":"Chicago","project_description":"The renovation of three schools for the Community Consolidated School District 93. Work included renovating the existing libraries into collaborative innovation centers, as well as constructing secure entry vestibules and new exterior canopies.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/community-consolidated-school-district-renovations-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/community-consolidated-school-district-renovations-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/community-consolidated-school-district-renovations-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/community-consolidated-school-district-renovations-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/community-consolidated-school-district-renovations-5.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Community Consolidated School District 93","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/community-consolidated-school-district-renovations-1-672x372.jpg"},{"project_ID":8520,"project_name":"Jardine Water Purification Plant Laboratory Improvements","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation of the Jardine Water Plan laboratory. Work included environmental demolition, new mechanical, electrical, and plumbing systems. The laboratory received all new laboratory equipment for water testing per EPA standards and office furniture. ","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/jardine-water-purification-plant-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/jardine-water-purification-plant-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/jardine-water-purification-plant-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/jardine-water-purification-plant-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/jardine-water-purification-plant-5.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Water Management ","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/jardine-water-purification-plant-4-672x372.jpg"},{"project_ID":8398,"project_name":"Jay Stream Middle School STEM Lab","project_location":"Carol Stream, IL","project_region":"Chicago","project_description":"The construction of a new STEM wing at Jay Stream Middle School. As the construction manager, we phased the construction to take place during school holidays and breaks to minimize disruptions. The new wing is 5,400 SF and includes six science labs, a design and research room, a virtual reality room, and a single sloped skylight spanning the entire length of the corridor.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Jay-Stream-Middle-School-STEM-lab-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Jay-Stream-Middle-School-STEM-lab-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Jay-Stream-Middle-School-STEM-lab-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Jay-Stream-Middle-School-STEM-lab-4.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Community Consolidated School District 93","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Jay-Stream-Middle-School-STEM-lab-1-672x372.jpg"},{"project_ID":8475,"project_name":"Lanthrop Homes River Front Improvements","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new seawall and pedestrian bridge as part of Related Midwest\u2019s Lathrop Homes redevelopment project. The updated river walk is one highlight of the 32-acre site that will feature residential units and new retail spaces.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/lanthrop-homes-river-front-improvements-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/lanthrop-homes-river-front-improvements-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/lanthrop-homes-river-front-improvements-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/lanthrop-homes-river-front-improvements-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/lanthrop-homes-river-front-improvements-5.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Landlease","project_sector":["Heavy Civil","Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/lanthrop-homes-river-front-improvements-1-672x372.jpg"},{"project_ID":8412,"project_name":"Larsen Middle School Gym Renovations","project_location":"Elgin, IL","project_region":"Chicago","project_description":"The renovation of the gymnasium at Larsen Middle School. Work included replacement of missing\/damaged floorboards, removal of the existing bleachers, replacement of wall fixtures, tiling, and water fountains.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Larsen-Middle-School-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Larsen-Middle-School-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Larsen-Middle-School-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"ARCON Associates - Elgin SD U46","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Larsen-Middle-School-1-672x372.jpg"},{"project_ID":8373,"project_name":"Leak Repairs to Concourse B & C Pedestrian Tunnel","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The demolition and reconstruction of the existing B\/C Tunnel pavement expansion joints and drip tray systems at the interfaces with Concourses B & C at O\u2019Hare International Airport (ORD). This project took place on an active airfield and required coordinated gate closures with United Airlines and the Chicago Department of Aviation.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBCTunnelLeakRepairs-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBCTunnelLeakRepairs-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBCTunnelLeakRepairs-3.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBCTunnelLeakRepairs-1-672x372.jpg"},{"project_ID":8454,"project_name":"Legler Regional Library Renovation","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation of an existing 36,000 SF two-story library built in 1919. Renovations included the remodeling of the existing floor plan, mechanical upgrades, fire alarm and security systems LED lighting conversion, new interior finishes, and technology infrastructure. Additional work includes improving accessibility by adding a lift to access the mezzanine level and elevator modernization.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/legler-regional-library-renovation-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/legler-regional-library-renovation-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/legler-regional-library-renovation-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Public Building Commission","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/legler-regional-library-renovation-3-672x372.jpg"},{"project_ID":8441,"project_name":"LINAC Replacement","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation and infrastructure upgrade of the Linear Accelerator (LINAC) at the University of Illinois Health Systems Outpatient Care Center. The LINAC is used for external beam radiation treatments for patients with cancer. The LINAC was installed in a thickened concrete vault, with an entrance designed as a maze in order to mitigate radiation scatter.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/linac-replacement-1.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Job Order Contracting","project_award":"","project_client":"University of Illinois Health Systems","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/linac-replacement-1-672x372.jpg"},{"project_ID":8510,"project_name":"Logistics Support Center","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The design-build of a 100,000 SF facility that serves as a warehouse, pipe bay, tool shop, and meter repair shop. The facility also includes administrative offices, open office areas, caf\u00e9 & kitchenette areas, storage facilities, and locker rooms.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/logistics-support-center-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/logistics-support-center-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/logistics-support-center-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/logistics-support-center-2.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Private Client","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/logistics-support-center-1-672x372.jpg"},{"project_ID":8526,"project_name":"Main Office Building Expansion","project_location":"Mansfield, TX","project_region":"South","project_description":"The renovation and expansion of an occupied and operational USPS main office in Mansfield, TX. This project was phased out and consisted of a 6,000 SF addition which contains a new work room, offices and electrical room. The renovation work included the service counter area, conference room, and storage room.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/main-office-building-expansion-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/main-office-building-expansion-2.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/main-office-building-expansion-3.jpeg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"United States Post Office Southern Facilities","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/main-office-building-expansion-1-672x372.jpg"},{"project_ID":8413,"project_name":"McDade Classical Elementary School Annex & Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction management services for the addition of a new, 9,600 SF gymnasium and multi-purpose room to the existing one-story McDade Classical Elementary School. The new annex includes a gymnasium, multipurpose room, office, storage, a science classroom, restrooms, and building support spaces\/rooms. This project was completed as a joint venture with Bowa Construction.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mcdade-renovations-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mcdade-renovations-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mcdade-renovations-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mcdade-renovations-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mcdade-renovations-5.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Public Building Commission","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mcdade-renovations-1-672x372.jpg"},{"project_ID":8517,"project_name":"Melvina Ditch Reservoir Improvements","project_location":"Burbank, IL","project_region":"Chicago","project_description":"The demolition and construction of the existing stormwater release and bypass system, pump house, sediment pad, spillway, and access road.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/melvina-ditch-reservoir-improvements-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/melvina-ditch-reservoir-improvements-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/melvina-ditch-reservoir-improvements-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/melvina-ditch-reservoir-improvements-4.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Metropolitan Water Reclamation District of Chicago","project_sector":["Heavy Civil","Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/melvina-ditch-reservoir-improvements-4-672x372.jpg"},{"project_ID":8406,"project_name":"Memorial Field Stadium Improvements","project_location":"Elgin, IL","project_region":"Chicago","project_description":"The improvements of the 150,000 SF Elgin High School Stadium. Improvements included the replacement of the existing running track, site lighting and controls, and a new drainage system.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Elgin-Highschool-Stadium-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Elgin-Highschool-Stadium-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Elgin-Highschool-Stadium-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Elgin High School","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Elgin-Highschool-Stadium-3-672x372.jpg"},{"project_ID":8495,"project_name":"Metro Memorial Park","project_location":"Washington, DC","project_region":"Mid-Atlantic","project_description":"The construction of a park in remembrance of the 2009 Metrorail accident that resulted in nine individuals losing their lives. Work included the implementation of landscaping, hardscaping, site amenities, installation of lighting, and various site furnishings.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/DC-Department-General-Services-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/DC-Department-General-Services-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/DC-Department-General-Services-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/DC-Department-General-Services-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"DC Department of General Services","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/DC-Department-General-Services-2-672x372.jpg"},{"project_ID":8480,"project_name":"Mile Long Bridge","project_location":"Willowsprings, IL","project_region":"Chicago","project_description":"The construction of a new northbound bridge structure, which has 27 spans supported by 26 piers, including multiple spans over waterways and active railroad tracks. The spans will support a total of nearly 427\u202fbeams of various lengths, including both steel and concrete.\u202fReducing the number of piers minimizes the environmental impact on the project area as well as the operations of adjacent transportation systems that include the Des Plaines River, Chicago Sanitary and Ship Canal, the Illinois and Michigan Canal, two sets of major railroad tracks, local roads, and a pipeline that sends jet fuel to O\u2019Hare Airport.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mile-long-bridge-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mile-long-bridge-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mile-long-bridge-3.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"None","project_award":"","project_client":"Illinois State Toll Highway Authority","project_sector":["Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mile-long-bridge-2-672x372.jpg"},{"project_ID":8423,"project_name":"Mitchell 1 Reception Remodel","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation of the existing radiology reception and waiting room at the University of Chicago Medical Center. Renovations included staff and public restrooms, elevator lobby, and upgrades spaces, finishes and aesthetic upgrades.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mitchell-1-reception-remodel-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mitchell-1-reception-remodel-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mitchell-1-reception-remodel-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Chicago Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/mitchell-1-reception-remodel-2-672x372.jpg"},{"project_ID":8442,"project_name":"Mitchell Dialysis Access Center","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The conversion of an existing patient recovery room and storage room into two dialysis port procedure rooms and a prep room at the University of Chicago Medicine's Mitchell Hospital. Work also included ceiling replacement, wall protection, flooring, and painting.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Mitchell-Dialysis-Access-Center-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Mitchell-Dialysis-Access-Center-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Mitchell-Dialysis-Access-Center-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Mitchell-Dialysis-Access-Center-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"University of Chicago Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Mitchell-Dialysis-Access-Center-1-672x372.jpg"},{"project_ID":8507,"project_name":"Morgan Street Station","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The reconstruction of the Morgan Station in the West Loop neighborhood of Chicago. This updated station consists of a modern glass and metal station house on either side of the Lake Street house and ADA-accessible station houses with elevators to the Green and Pink CTA lines. A bridge above the tracks connects the buildings, and translucent canopies above each platform have information screens suspended from them.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/morgan-street-station-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/morgan-street-station-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/morgan-street-station-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/morgan-street-station-4.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Transportation","project_sector":["Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/morgan-street-station-2-672x372.jpg"},{"project_ID":8437,"project_name":"MRI Replacement","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The replacement of an MRI and CT machine at the SimonMed Streeterville location. Other improvements included HVAC, electrical, and structural upgrades to accommodate the new equipment.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/streeterville-mri-replacement-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/streeterville-mri-replacement-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/streeterville-mri-replacement-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"SimonMed Imaging LLC","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/streeterville-mri-replacement-2-672x372.jpg"},{"project_ID":8432,"project_name":"Multi-Specialty Ambulatory Clinic","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The build-out of an existing office space into a new Mutli-Specialty Clinic location for UIC\u2019s College of Medicine. This clinic serves as an opportunity for UIC to offer specialty services in a new convenient location to many patients.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/multi-specialty-ambulatory-clinic-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/multi-specialty-ambulatory-clinic-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/multi-specialty-ambulatory-clinic-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/multi-specialty-ambulatory-clinic-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois - Chicago","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/multi-specialty-ambulatory-clinic-1-672x372.jpg"},{"project_ID":8508,"project_name":"North Shop Field Service Center","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The design-build of an 83,000 SF two-story building that serves as a fleet hub, service center, office, warehouse, and field support shop.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/north-shop-field-service-center-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/north-shop-field-service-center-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/north-shop-field-service-center-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/north-shop-field-service-center-4.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Private Client","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/north-shop-field-service-center-1-672x372.jpg"},{"project_ID":8439,"project_name":"OB Emergency Renovation","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The complete renovation of the 4th floor NW wing into an Obstetrical Emergency Room unit at UI Hospital. This new unit includes a central nurse\u2019s station, 6 Exam Rooms, an Ultrasound Room, Procedure Room, and supporting rooms which include HLD, Soiled Hold, and Clean Utilities.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ob-emergency-renovations-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ob-emergency-renovations-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ob-emergency-renovations-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois - Chicago","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ob-emergency-renovations-3-672x372.jpg"},{"project_ID":8396,"project_name":"Pathways for Student Success Office Renovations","project_location":"Milton, IL","project_region":"Chicago","project_description":"The renovation of the Berg Instructional Center (BIC) at the College of DuPage. This project included the complete interior demolition of existing office spaces and included the construction of new office spaces, conference rooms, study areas, and support zone with new finishes.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/college-of-dupage-offices-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/college-of-dupage-offices-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/college-of-dupage-offices-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"College of DuPage","project_sector":["Education"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/college-of-dupage-offices-1-672x372.jpg"},{"project_ID":8383,"project_name":"Pedestrian Tunnel Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation and construction of the pedestrian tunnel at O\u2019Hare International Airport (ORD). Work consisted of water infiltration remediation improvements and interior renovations to 10 pedestrian tunnels. This project was completed to put an end to Chicago Department of Aviation constant maintenance of the tunnel.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/pedestrian-tunnel-renovations-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/pedestrian-tunnel-renovations-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/pedestrian-tunnel-renovations-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/pedestrian-tunnel-renovations-4.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Chicago Department of Aviation ","project_sector":["Aviation","Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/pedestrian-tunnel-renovations-4-672x372.jpg"},{"project_ID":8447,"project_name":"Police Heliport","project_location":"Fairfax, VA","project_region":"Mid-Atlantic","project_description":"The demolition of the existing Fairfax County Police Department Heliport and construction of a new facility in the same location including a 23,000 SF building that incorporates a helicopter maintenance bay, aircraft and vehicle fuel stations, crew office & living quarters, and other associated site improvements in the immediate vicinity.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Police-Heliport-1.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Police-Heliport-2.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Police-Heliport-3.jpeg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Fairfax County Department of Public Works & Environmental Services","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Fairfax-County-Police-Heliport-2-672x372.jpeg"},{"project_ID":8493,"project_name":"Pool Addition and Mechanical Upgrades","project_location":"Chicago Heights, IL","project_region":"Chicago","project_description":"The construction of a 5,000 SF precast addition to house a new pool at the park district facility. F.H. Paschen also replaced the existing HVAC system, renovated the weight rooms, expanded and modified the locker room, and added new bathrooms and saunas.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Heights-Park-District-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Heights-Park-District-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Heights-Park-District-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Heights-Park-District-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"CM@Risk","project_award":"","project_client":"Chicago Heights Park District","project_sector":["Parks & Recreation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Chicago-Heights-Park-District-4-672x372.jpg"},{"project_ID":8440,"project_name":"Postpartum Renovation","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The interior renovation of the 4,000 SF fifth floor for UIC Hospital. This project included the demolition of the space and construction of 10 new private rooms with ADA restrooms. Each room has an individual induction unit to better provide patients with personal care.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-postpartum-renovation-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-postpartum-renovation-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-postpartum-renovation-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"University of Illinois Health Systems","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/UIC-postpartum-renovation-1-672x372.jpg"},{"project_ID":8438,"project_name":"PR6 Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-pr6-renovations-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-pr6-renovations-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-pr6-renovations-3.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Rush University Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-pr6-renovations-1-672x372.jpg"},{"project_ID":8448,"project_name":"Public Library Renovations","project_location":"Palatine, IL","project_region":"Chicago","project_description":"The 65,000 SF renovation project that provided enhancements to the overall library experience and improvements to the building. Project was completed in multiple phases so the library could remain operational throughout construction.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/palatine-public-library-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/palatine-public-library-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/palatine-public-library-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/palatine-public-library-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/palatine-public-library-5.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/palatine-public-library-6.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Palatine Public Library District","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/palatine-public-library-6-672x372.jpg"},{"project_ID":8481,"project_name":"Ravenswood Ballasted Track Improvements","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The track renewal at Francisco, Kedzie, and Rockwell. All three stations received track renewal, replacement of all ties and rail assemblies, along with the ballast below the bottom of new\u202fties; running rails on tracks 1 and 2 to the West of the grade crossing; and all ROW signage.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ravenswood-ballasted-1.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ravenswood-ballasted-2.jpeg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ravenswood-ballasted-3.jpeg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Chicago Transit Authority","project_sector":["Heavy Civil","Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ravenswood-ballasted-3-672x372.jpeg"},{"project_ID":8376,"project_name":"Recirculation Bridge Replacement","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The removal and replacement of the inbound and outbound recirculation bridge of the main parking garage at O\u2019Hare International Airport (ORD). This project also included drainage and electrical on the roadway under the bridge.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/recirculation-bridge-replacement-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/recirculation-bridge-replacement-2.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation","Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/recirculation-bridge-replacement-2-672x372.jpg"},{"project_ID":8449,"project_name":"Restoration of Jackson Graham Building","project_location":"Washington, DC","project_region":"Mid-Atlantic","project_description":"The renovation and rehabilitation of WMATA\u2019s headquarters in Washington, D.C after a fire. Renovations included new furniture, electrical, and remediated all smoke damage. F.H. Paschen rehabilitated and renovated the fire-damaged building within an accelerated four-month schedule.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fire-renovation-jackson-graham-building-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fire-renovation-jackson-graham-building-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fire-renovation-jackson-graham-building-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fire-renovation-jackson-graham-building-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fire-renovation-jackson-graham-building-5.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Washington Metropolitan Area Transit Authority","project_sector":["Municipal"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/fire-renovation-jackson-graham-building-2-672x372.jpg"},{"project_ID":8424,"project_name":"River East Renovation","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The interior renovation of a healthcare clinic for the University of Chicago Medical Center in River East Chicago. The project included adding more exam rooms and an expansion of the infusion clinic.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rivereast-renovation-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rivereast-renovation-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rivereast-renovation-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rivereast-renovation-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"University of Chicago Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rivereast-renovation-1-672x372.jpg"},{"project_ID":8462,"project_name":"Rock Island District 47th St. Yard Renovations","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of a new facility, as well as renovations to three other buildings at the Metra 47th Street Yard support facility located on Metra\u2019s Rock Island District line.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rock-island-district-47th-renovation-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rock-island-district-47th-renovation-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rock-island-district-47th-renovation-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rock-island-district-47th-renovation-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rock-island-district-47th-renovation-5.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rock-island-district-47th-renovation-6.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Metra \/ Northeast Illinois Railroad Corp","project_sector":["Heavy Civil","Transit","Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rock-island-district-47th-renovation-4-672x372.jpg"},{"project_ID":8386,"project_name":"Runway 9R-27L Extension","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The construction of lengthening the runway 9R-27L at O\u2019Hare International Airport (ORD). This package included work to associated taxiways, earth work, storm sewer, electrical, and taxiway and runway pavement construction.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/9R-27L-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/9R-27L-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/9R-27L-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/9R-27L-4.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"None","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation","Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/9R-27L-4-672x372.jpg"},{"project_ID":8379,"project_name":"Station Improvements","project_location":"Milwaukee, WI","project_region":"Great Lakes","project_description":"The renovation of the Southwest Airlines Cargo building at General Mitchell International Airport (MKE). This airside project was completed as a multi-phased, the first phase consisted of renovating the locker rooms and new ATO office. The second phase focused on the renovation of old ATO and BSO office.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/station-improvements-southwest.jpeg?time=1713550755"],"project_value":"$","project_alternative_delivery":"None","project_award":"","project_client":"Southwest Airlines","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/station-improvements-southwest-672x372.jpeg"},{"project_ID":8519,"project_name":"Super Satellite Decommissioning","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The demolition of a 71,000 SF satellite fuel facility and removal of eighteen 50,000-gallon underground storage tanks that housed jet fuel for Terminals 2, 3 and 5. This design-build project was completed on an operational airfield at O\u2019Hare International Airport.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ORD-super-satellite-decommissioning-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ORD-super-satellite-decommissioning-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ORD-super-satellite-decommissioning-3.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"2022: Chicago Department of Aviation \u2013 1 Green Airplane for Sustainable Design and Construction","project_client":"ORD Fuel Company","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/ORD-super-satellite-decommissioning-3-672x372.jpg"},{"project_ID":8511,"project_name":"Support Services","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation of the 17,000 SF training center to provide office space and an emergency dispatch center. This project also included a new 6,500 SF addition for regulatory training, safety training and appliance training areas.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/support-services-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/support-services-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/support-services-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/support-services-4.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Private Client","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/support-services-1-672x372.jpg"},{"project_ID":8374,"project_name":"Taxiway “A” Rehabilitation – Phase 1 & 2","project_location":"Gary, IN","project_region":"Chicago","project_description":"The rehabilitation of taxiway A at the Gary Chicago International Airport (GYY). This project was completed in two phases to remove, replace, mill, and pave taxiway A.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Gary-Chicago-Rehab-Taxiway-P11.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Gary-Chicago-Rehab-Taxiway-P12.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/Gary-Chicago-Rehab-Taxiway-P13.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/Gary-Chicago-Rehab-Taxiway-P21.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/Gary-Chicago-Rehab-Taxiway-P22.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/Gary-Chicago-Rehab-Taxiway-P23.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2023\/01\/Gary-Chicago-Rehab-Taxiway-P24.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Unit Price","project_award":"","project_client":"Gary Chicago International Airport","project_sector":["Aviation","Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/Gary-Chicago-Rehab-Taxiway-P11-672x372.jpg"},{"project_ID":8382,"project_name":"Terminal 5 Infrastructure","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The pavement removal, subgrade improvements, new\u202fapron\u202fpaving work at gates adjacent to the new East Extension of Terminal 5 Concourse M and the existing Terminal 5 gates. This project also consisted of building concrete work for the new East extension of Terminal 5 Concourse M and the expansion of the existing Terminal 5 building.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/terminal-5-infrastructure-1-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/terminal-5-infrastructure-2-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/terminal-5-infrastructure-3-scaled.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/terminal-5-infrastructure-4-scaled.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"None","project_award":"","project_client":"Austin Powers Partners","project_sector":["Aviation","Heavy Civil"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/terminal-5-infrastructure-2-672x372.jpg"},{"project_ID":8377,"project_name":"Terminal Restroom Modernization","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The renovation of 12,760 SF of existing men\u2019s and women\u2019s restrooms. This included nine project sites within O\u2019Hare International Airport\u2019s (ORD) Terminal 1 and Terminal 3.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBathrooms-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBathrooms-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBathrooms-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBathrooms-4.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Chicago Department of Aviation","project_sector":["Aviation"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/OHareBathrooms-1-672x372.jpg"},{"project_ID":8523,"project_name":"Tipton & Russet East GIS Enclosures","project_location":"Baltimore, MD","project_region":"Mid-Atlantic","project_description":"The construction of a pre-engineered metal building with a 46-foot-tall, 69,618 SF substation with a 204-foot clear span. Work at the Russet East substation included the construction of a pre-engineered metal building with a 35-foot-tall, 22,470 SF switching station with a 57-foot clear span.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/GIS-enclosures-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/GIS-enclosures-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/GIS-enclosures-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/GIS-enclosures-4.jpg?time=1713550755"],"project_value":"$$","project_alternative_delivery":"None","project_award":"","project_client":"Confidential Client","project_sector":["Utilities & Industrial"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/GIS-enclosures-1-672x372.jpg"},{"project_ID":8434,"project_name":"Wellness Office","project_location":"Chicago, IL","project_region":"Chicago","project_description":"The interior renovation to provide functional and aesthetic upgrades to meet the needs of the new Wellness Office department for Rush University Medical Center. Renovations included a private meeting space, conference rooms, a lounge, kitchen, and office spaces with a focus on acoustics and rich interior finishes.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-wellness-office-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-wellness-office-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-wellness-office-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-wellness-office-4.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-wellness-office-5.jpg?time=1713550755"],"project_value":"$","project_alternative_delivery":"Design-Bid-Build","project_award":"","project_client":"Rush University Medical Center","project_sector":["Healthcare"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/rush-wellness-office-2-672x372.jpg"},{"project_ID":8464,"project_name":"Wells-Wentworth Connector","project_location":"Chicago, IL","project_region":"Midwest","project_description":"The multi-phased construction of a new road between the Loop and Chinatown. The project will also realign Wentworth Ave. between Archer and Cermak to bring this part of Wentworth in line with the part of Wentworth south of Cermak Rd. The realignment of Wentworth Ave. will greatly improve safety for both motorists and pedestrians while forming better links between New Chinatown Square and the traditional Chinatown south of Cermak Road.","project_gallery_ids":["https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/wells-wentworth-connector-1.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/wells-wentworth-connector-2.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/wells-wentworth-connector-3.jpg?time=1713550755","https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/wells-wentworth-connector-4.jpg?time=1713550755"],"project_value":"$$$","project_alternative_delivery":"Design-Build","project_award":"","project_client":"Chicago Department of Transportation","project_sector":["Heavy Civil","Transit"],"project_thumbnail_url":"https:\/\/6mr46f.a2cdn1.secureserver.net\/wp-content\/uploads\/2022\/10\/wells-wentworth-connector-3-672x372.jpg"}]